ATTY/RESO.0114/PC RESO CERTIFYING FINAL EIR – 557 E. BAYSHORE ROAD <br />REV: 12-09-22 VR <br />Page 55 of 61 <br />Mitigation Monitoring or Reporting Program <br />557 East Bayshore Road Project (SCH #2017072047) <br />Impacts Mitigation Timeframe for <br />Implementation <br />Responsibility <br />for <br />Implementatio <br />n <br />Oversight of <br />Implementatio <br />n <br />USFWS. <br /> <br />Less than <br />Significant Impact <br />with Mitigation <br />Incorporated <br />all gravel and fill material will be certified weed- <br />free to the satisfaction of the City. Any deviation <br />from this will be approved by the City. <br /> During project construction, vehicles and all <br />equipment will be washed (including wheels, <br />undercarriages, and bumpers) before and after <br />entering the proposed project footprint. Vehicles <br />will be cleaned at existing construction yards or <br />legally operating car washes. <br /> Following construction of project, a standard <br />erosion control seed mix (acceptable to the City) <br />from a local source will be planted within the <br />temporary impact zones on any disturbed ground <br />that will not be under hardscape, landscaped, or <br />maintained. This will minimize the potential for the <br />germination of the majority of seeds from non- <br />native, invasive plant species. <br />rice straw, and all <br />gravel and fill <br />material will be <br />certified weed-free to <br />the satisfaction of the <br />City. During project <br />construction, vehicles <br />and all equipment will <br />be washed (including <br />wheels, <br />undercarriages, and <br />bumpers) before and <br />after entering the <br />proposed project <br />footprint. Following <br />construction of <br />project, a standard <br />erosion control seed <br />mix from a local <br />source will be planted <br />within the temporary <br />impact zones on any <br />disturbed ground that <br />will not be under <br />hardscape, <br />landscaped, or