Laserfiche WebLink
ATTY/RESO.0114/PC RESO CERTIFYING FINAL EIR – 557 E. BAYSHORE ROAD <br />REV: 12-09-22 VR <br />Page 57 of 61 <br />Mitigation Monitoring or Reporting Program <br />557 East Bayshore Road Project (SCH #2017072047) <br />Impacts Mitigation Timeframe for <br />Implementation <br />Responsibility <br />for <br />Implementatio <br />n <br />Oversight of <br />Implementatio <br />n <br />subdivision (b). <br /> <br />Less than <br />Significant Impact <br />with Mitigation <br />Incorporated <br /> <br /> Provide financial incentives for employees and/or <br />patrons that utilize alternative modes of <br />transportation to travel to and from the site (i.e., <br />parking cash outs, carshare/bikeshare <br />memberships and/or subsidies, transit subsidies, <br />etc.). <br /> <br />The TDM plan shall be submitted and approved by the <br />Community Development and Transportation <br />Department, and shall be monitored annually to gauge its <br />effectiveness in meeting the required VMT reduction. A <br />transportation professional working at the City’s direction <br />and pursuant to a scope of work approved by the City <br />Engineer shall conduct traffic counts annually to measure <br />the daily and peak-hour entering and exiting vehicle <br />volumes. The volumes will be compared to the trip <br />thresholds to determine whether the reduction in vehicle <br />trips is being met. In addition to monitoring driveway <br />volumes, a survey will be developed by the transportation <br />professional to determine actual mode splits for <br />employees and patrons of the fitness center. The survey <br />will also gather information on usage of individual TDM <br />plan components. The results of the annual vehicle <br />counts and survey will be reported in writing by the <br /> City’s direction <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />