My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso 23-17 Reso 0075 1690 Broadway
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2023
>
Reso 23-17 Reso 0075 1690 Broadway
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 11:46:26 AM
Creation date
7/31/2024 11:46:17 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
7/18/2023
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/31/2024 11:46 AM
Modified:
7/31/2024 11:46 AM
Text:
http://www.svcw.org/departments/SitePages/Environmental%20Services.aspx
ID:
2
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/31/2024 11:46 AM
Modified:
7/31/2024 11:46 AM
Text:
http://www.svcw.org/departments/SitePages/Environmental%20Services.aspx
ID:
3
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/31/2024 11:46 AM
Modified:
7/31/2024 11:46 AM
Text:
http://www.svcw.org/departments/SitePages/Environmental%20Services.aspx
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0075/PC RESO 1690BROADWAY <br />REV: 07-18-23 JB <br />Page 16 of 24 <br />36. Recycled Water Facilities – Recycled water (purple pipe) facilities shall be provided and designed in accordance with Engineering Standards for dual plumbing, irrigation, and other warranted uses per the Recycled Water Ordinance, Chapter 38. Services that are to be supplied by recycled water (either at the time of project completion or at a future date) shall be designed to properly function at the design pressure required by Engineering. Upon a final determination by the City that recycled water is available for the property, the applicant shall connect the project to the recycled water system. [SDR][ENGINEERING] <br />37. Recycled Water Report - The applicant shall hire an engineer licensed in California and experienced in the field of wastewater treatment to prepare a recycled water report for dual plumbed facilities, pursuant to California Water Code section 13522.5 and in accordance with California Code of Regulations sections 60314 and 60323 (found within Title 22, Division 4, Chapter 3). The report shall be submitted prior to project closeout, and will be routed to the Public Works Department for review and coordination. It is recommended a draft of the report is prepared prior to commencing any plumbing work to prevent the need for unplanned changes. [COA][ENGINEERING] <br />38. Cross-Connection Control Test - Prior to issuance of the certificate of occupancy, all applicable plumbing systems must pass a cross-connection control test, performed by a Cross-Connection Control Specialist Certified through the CA-NV Section of the AWWA and observed by Public Works staff. The cross-connection control test method must be included in the Recycled Water Report. The applicant is responsible for all fees associated with the performance of the cross-connection control test. [COA] [ENGINEERING] <br />39. Discharge Permit for Subterranean Garages - If the subterranean garage requires groundwater pumping into the sewer system, a Discharge fee will apply and a Discharge Permit will be required by Silicon Valley Clean Water (SCVW) prior to issuance of the building permit. [SDR][ENGINEERING] <br />40. Backflow Protection – Backflow protection on all water services is required. The backflow preventer shall be above grade and located on private property, accessible to the Public Works division for testing. [COA][ENGINEERING] <br />41. Fire Flow - The Project shall meet fire flow requirements as established by the Fire Department which are based on the Fire Code. Fire flow tests are typically performed during the preliminary design phase but must be completed prior to submittal of final design. Applicant shall contact the Fire Department for fire flow requirements, and then submit a written fire flow test request to Engineering. [COA][ENGINEERING] <br />42. C3 Requirements - Plans shall be designed to meet C3 requirements of the Municipal Regional Permit (MRP) NPDES Permit CAS612008 and be in compliance with San Mateo County C.3 Stormwater Technical Guidance. [SDR][ENGINEERING]
The URL can be used to link to this page
Your browser does not support the video tag.