Laserfiche WebLink
ATTY/RESO.0075/PC RESO 1690BROADWAY <br />REV: 07-18-23 JB <br />Page 18 of 24 <br />tributary area of the project frontage up to Beech Street. [SDR][ENGINEERING] <br />47. Repair or Replace Street Infrastructure - Restore streets surrounding the project site to the satisfaction of the City Engineer at project completion. When this requires additional pavement restoration, the Engineer shall approve the preferred layout of pavement markings. [SDR][ENGINEERING] <br />48. Reconstruction of Frontage Streets - The applicant shall replace, repair, repave, or reconstruct street, curb, gutter and sidewalk pursuant to City Ordinance chapter 18, article XIV. The applicant shall construct bulb-outs on all four corners of the intersection of Broadway Street and Beech Street, reconstruct the full width of the project frontage on Broadway and Marshall Street with a pavement overlay, and resurface Beech Streets with a Type II micro-surfacing emulsion. [SDR][ENGINEERING] <br />49. Parking Garage Ramps - Parking garage ramps shall meet the Design Criteria of the Engineering Standards and consider safety and visibility of pedestrians to the satisfaction of the City Engineer. Access controls shall be designed and placed in such a way that vehicles do not block the public sidewalk or queue in the public right-of-way. The access control system shall be delineated in the building permit submittal. Person doors with panic hardware and alarms shall be installed at or adjacent to gates between private and public parking to allow the safest emergency egress path of travel. [SDR][ENGINEERING] <br />50. Striping Plan- Applicant shall submit an updated striping plan to City Staff for review. These improvements shall be included as part of the building permit submittal package and approved by the City Engineer. The striping plan shall include roadway striping details and curb painting details. [COA] [ENGINEERING] <br />51. Shoring for Excavations – No tiebacks shall extend into the public right of way or onto adjacent properties without the written agreement of the City and/or private property owner. Any tie-backs within the City’s right of way shall be de-tensioned prior to permit sign-off and/or project acceptance. [COA] [ENGINEERING] Construction-Related Activities <br />52. Hours of Construction – On-Site Construction activity is permitted between 7:00 a.m. and 8:00 p.m. Monday through Friday, except as permitted on weekends by the Building Official, and shall adhere to the City’s Noise Ordinance. If possible, the noisiest construction activities would be scheduled for daytime hours when the ambient noise levels are highest. [SDR][BUILDING] <br />53. Pre-Construction Meeting - After City permits are approved, but prior to start of construction, hold a preconstruction conference with Engineering and Building staff and other interested parties. The developer shall arrange for the attendance of the construction manager, contractor, and all subcontractors who are