My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso 23-17 Reso 0075 1690 Broadway
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2023
>
Reso 23-17 Reso 0075 1690 Broadway
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2024 11:46:26 AM
Creation date
7/31/2024 11:46:17 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
7/18/2023
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/31/2024 11:46 AM
Modified:
7/31/2024 11:46 AM
Text:
https://library.municode.com/ca/redwood_city/codes/zoning?nodeId=ART53MIECOZODI_53.8FACOARRE
ID:
2
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
7/31/2024 11:46 AM
Modified:
7/31/2024 11:46 AM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH24NORE_ARTIIEXUNNO_DIV3CO_S24.32TILI
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0075/PC RESO 1690BROADWAY <br />REV: 07-18-23 JB <br />Page 23 of 24 <br />9.48] F19. Emergency Planning and Information: Buildings with four (4) or more stories in height must have posted a floor plan sign which must provide emergency procedures at every stairway landing, elevator landing, and immediately inside all public entrances to the building. [CFC 907.2.12.3.1-B and Redwood City Code of Ordinances §12.23] F20. Electric Vehicle Charging Stations. Where provided, electric vehicle charging stations must be installed per the California Electrical Code. Electric vehicle charging system equipment must be listed and labeled per UL 2202. Electric vehicle supply equipment must be listed and labeled per UL 2594. [CBC §406.2.7] F21. Construction Egress and Standpipes: During construction when building construction exceeds 40 feet in height above the lowest level of fire department vehicle access a temporary or permanent stairway must be provided, and as construction progresses, the stairway must be extended to within one floor of the highest point of construction having secured decking or flooring, and not less than one Class I standpipe must be provided for use, and the standpipe must be installed prior to construction exceeding 40 feet in height above the lowest level of fire department vehicle access, with the standpipe provided with fire department hose connections at locations adjacent to the stairways and must be extended to within one floor of the highest point of construction having secured decking or flooring. [CFC §§3311.1 and 3313.1] General Requirements <br />66. Exterior Materials – The exterior materials, colors, textures, trim elements, windows and roof pitch of the project shall be consistent throughout. [COA][PLANNING] <br />67. Façade Elements – Elements of the façades, including canopies, shall comply with all City Zoning Code and Municipal Code requirements. [SDR][PLANNING] <br />68. Review of Modifications - All modifications to the approved plans shall be submitted to Planning for review and approval prior to the issuance of a Building Permit. Substantial modification of approved plans, as determined by the Zoning Administrator, may be subject to an amendment or a new Permit. [COA][PLANNING] <br />69. Hours of Construction – Construction activity is permitted between 7:00 a.m. and 8:00 p.m. Monday through Friday, except as permitted on weekends by the Building Official. [SDR][BUILDING] <br />70. Indemnification – Per Redwood City Code Section 1.54, Applicant shall defend (with counsel approved by City), indemnify, and hold harmless the City, its agents,
The URL can be used to link to this page
Your browser does not support the video tag.