My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt24 Cratus, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2024
>
Agmt24 Cratus, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2024 2:51:40 PM
Creation date
8/22/2024 2:51:10 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Recycled Water Project Main City Distribution System
RMP File Number
304
Date
8/7/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Polyethylene Pipe Mainline, include the 30" High Density Polyethylene <br />Pipe? <br />Pursuant to Item 1.03 B in Section 01 1100 of the project specifications, Bid Item <br />#9, Furnish and Install 42" Diameter Steel Pipe Casing by Bore and Jack Method <br />and New 30" High Density Polyethylene Pipe Mainline, includes all labor, <br />materials, tools, and incidentals to install both 42" Steel Pipe Casing and 30" <br />High Density Polyethylene Pipe. <br />5. Can you advise what the approximate start date for this project might be? <br />Pursuant to Item 5.02 in Section 00 7200 of the project specifications, the <br />Contract Time will commence to run on the 60th Day after the issuance of the <br />Notice of Award, or if a Notice to Proceed is given, on the date indicated in the <br />Notice to Proceed. City may give a Notice to Proceed at any time within 60 Days <br />after the issuance of the Notice of Award. <br />For questions or clarifications regarding this Addendum No. 1, please call or email at <br />the contact information below: <br />Alex Chan <br />Senior Civil Engineer <br />Community Development and Transportation Department <br />Phone: (650) 780-7307 <br />E-mail: achanQredwoodcitV.orcl <br />ATTACHMENTS: <br />Revised Bid Form <br />Revised Bid Plan Sheets 4 and Sheet 5 <br />Revised Specification Sections 01 1100 <br />cc: James O'Connell, City Engineer, City of Redwood City <br />File <br />r a a a a a M a a a a a a a a•■■ a a a a a....■ a■. a..■■ a a.■■ a a.. a.. w <br />Bidders shall acknowledge receipt of all 6 pages of Addendum No. 1 by signing <br />the acknowledgment line below and attaching this letter to their submitted <br />proposal, please include only this sheet, page 6 of the Addendum. Failure to <br />acknowledge the Addendum issued may result in your proposal being deemed <br />non-responsive. <br />ADDENDUM #1 ACKNOWLEDGMENT <br />Michael Kirwan - 05/29/2024 <br />Signature Date <br />VERA AVENUE BICYCLE BOULEVARD PROJECT ADDENDUM NO. 1 PAGE 6 OF 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.