Laserfiche WebLink
Polyethylene Pipe Mainline, include the 30" High Density Polyethylene <br />Pipe? <br />Pursuant to Item 1.03 B in Section 01 1100 of the project specifications, Bid Item <br />#9, Furnish and Install 42" Diameter Steel Pipe Casing by Bore and Jack Method <br />and New 30" High Density Polyethylene Pipe Mainline, includes all labor, <br />materials, tools, and incidentals to install both 42" Steel Pipe Casing and 30" <br />High Density Polyethylene Pipe. <br />5. Can you advise what the approximate start date for this project might be? <br />Pursuant to Item 5.02 in Section 00 7200 of the project specifications, the <br />Contract Time will commence to run on the 60th Day after the issuance of the <br />Notice of Award, or if a Notice to Proceed is given, on the date indicated in the <br />Notice to Proceed. City may give a Notice to Proceed at any time within 60 Days <br />after the issuance of the Notice of Award. <br />For questions or clarifications regarding this Addendum No. 1, please call or email at <br />the contact information below: <br />Alex Chan <br />Senior Civil Engineer <br />Community Development and Transportation Department <br />Phone: (650) 780-7307 <br />E-mail: achanQredwoodcitV.orcl <br />ATTACHMENTS: <br />Revised Bid Form <br />Revised Bid Plan Sheets 4 and Sheet 5 <br />Revised Specification Sections 01 1100 <br />cc: James O'Connell, City Engineer, City of Redwood City <br />File <br />r a a a a a M a a a a a a a a•■■ a a a a a....■ a■. a..■■ a a.■■ a a.. a.. w <br />Bidders shall acknowledge receipt of all 6 pages of Addendum No. 1 by signing <br />the acknowledgment line below and attaching this letter to their submitted <br />proposal, please include only this sheet, page 6 of the Addendum. Failure to <br />acknowledge the Addendum issued may result in your proposal being deemed <br />non-responsive. <br />ADDENDUM #1 ACKNOWLEDGMENT <br />Michael Kirwan - 05/29/2024 <br />Signature Date <br />VERA AVENUE BICYCLE BOULEVARD PROJECT ADDENDUM NO. 1 PAGE 6 OF 6 <br />