My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agda Pkt 2024.08.26 Regular Meeting
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2024
>
Agda Pkt 2024.08.26 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2024 10:48:21 AM
Creation date
8/27/2024 10:41:05 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
8/26/2024
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
8/27/2024 10:48 AM
Modified:
8/27/2024 10:48 AM
Text:
http://www.redwoodcity.org/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1018
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 of 3 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.org <br />STAFF REPORT <br />To the Honorable Mayor and City Council <br />From the City Manager <br />DATE: August 26, 2024 <br />SUBJECT <br />Improvement and Maintenance Agreements with Caltrans related to the Elco Yards development at 1601 <br />El Camino Real to facilitate the installation of enhanced pedestrian and bicyclist safety improvements <br />along El Camino Real <br />RECOMMENDATION <br />Adopt a resolution approving and authorizing the City Manager to execute: <br />(1) a Highway Improvement Agreement with IQHQ Elco Yards, LP and State of California Department of <br />Transportation (Caltrans); and <br />(2) a Project Specific Maintenance Agreement with the State of California Department of Transportation <br />(Caltrans), and to take all actions necessary to carry out the Agreements. <br />STRATEGIC PLAN GUIDING PRINCIPLE <br />Transportation <br />BACKGROUND <br />The Elco Yards project (previously referred to as the South Main Mixed-Use Project), located between El <br />Camino Real, Maple, Cedar and Main Streets, includes the proposed construction of 530,000 square feet <br />(sf) of office, 501 residential units (including 108 affordable units), 28,000 sf of retail (including 19,000 sf <br />of family friendly entertainment), 8,400 sf of child care and 40,000 sf of publicly-accessible open space <br />(square footages are approximate). On April 25, 2022, the City Council approved, among other approvals, <br />the Subdivision Improvement Agreement for the construction of on-site and off-site improvements, <br />Landscape Maintenance Agreements, and Stormwater Treatment Measures Maintenance Agreements. <br />The improvements included a proposed traffic signal at the Pine/Main intersection as well as <br />improvements within the El Camino Real right-of-way consisting of a pedestrian crossing with flashing <br />beacon at Beech/Lincoln, intersection improvements at Maple, and protected bike lanes along the project <br />6.K. - Page 1 of 67 <br />385
The URL can be used to link to this page
Your browser does not support the video tag.