My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agda Pkt 2024.08.26 Regular Meeting
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2024
>
Agda Pkt 2024.08.26 Regular Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/27/2024 10:48:21 AM
Creation date
8/27/2024 10:41:05 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
8/26/2024
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1018
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SR 82 & SR 84 <br />8-2024 <br />Page 2 of 5 <br /> <br /> <br /> <br />NOW THEREFORE, IT IS AGREED AS FOLLOWS: <br /> <br />SECTION II <br />AGREEMENT <br /> <br />1. PARTIES agree this Agreement shall supersede any portion of existing <br />Maintenance Agreement(s) executed by PARTIES that include the area <br />within the PROJECT improvements. <br /> <br />2. Exhibit A consists of plan drawings that delineate and describe the areas within <br />STATE right of way which are the responsibility of the CITY to maintain in <br />accordance with this Agreement. <br /> <br />3. PARTIES may mutually agree to amend Exhibit A to this Agreement to revise <br />the maintenance responsibilities between PARTIES. <br /> <br />4. VEHICULAR INTERSECTIONS <br /> <br />4.1. At SR 82/Maple Street and SR 82/Beech Street, CITY will maintain, at CITY <br />expense, the sidewalks, curbs ramps, median, lighting installations, <br />sweeping and debris removal. <br /> <br />4.2. At SR 82/Beech Street, CITY will maintain the PHB signal. <br /> <br />4.3. At SR 84/Main Street/Pine Street, CITY will maintain, at CITY expense, the <br />sidewalk and curb ramps along Main Street. <br /> <br />4.4. At SR 84/Main Street/Pine Street, CITY will maintain the vehicular and <br />pedestrian signalization and lighting connected to the signalization. CITY <br />will be responsible for the cost of electrical energy. <br /> <br />5. LANDSCAPED AREAS - CITY is responsible for the maintenance of any trees and <br />bioretention planter improvements of PROJECT. <br /> <br />6. BICYCLE PATHS, LANES, AND CYCLE TRACKS – constructed as permitted <br />encroachments within STATE’s right of way, CITY is solely responsible for the <br />maintenance of the path/lane/cycle track; including but not limited to: <br />delineation, sweeping, debris removal when necessary, signing, and striping, <br />surface pavement distress. CITY will maintain, at CITY expense, a safe facility <br />for pedestrian and bicycle use along the entire length of the path/lane/cycle <br />track, for the direction and operation of that non-motorized facility. <br />ATTY/AGR.2024.132/Caltrans (Project Specific Maintenance Agreement)(REV: 08-20-24 VR) (Page 2 of 9) <br />6.K. - Page 5 of 67 <br />389
The URL can be used to link to this page
Your browser does not support the video tag.