Agreement 04-2958 <br />Project No. 0424000060 <br />Project Development Agreement 2017-02-17/HIA (Created October 5, 2023)12 of 22 <br />PERMITTEE will submit a written request to CALTRANS for any Department Furnished Material <br />(DFM) identified in the PROJECT plans, specifications, and estimate a minimum of sixty (60) <br />working days prior to the construction start of work. PERMITTEE will submit a written <br />request to CALTRANS for any additional DFM deemed necessary during the PROJECT <br />construction. <br />CALTRANS will make the DFM available at a CALTRANS-designated location. <br />As the CONSTRUCTION IMPLEMENTING AGENCY, PERMITTEE is responsible for <br />maintenance of the State Highway System (SHS) within the PROJECT limits as part of the <br />construction contract until the following conditions are met: <br />•Any required maintenance agreements are executed for the portions of SHS for which <br />relief of maintenance is to be granted. <br />•CALTRANS approves a request from PERMITTEE for relief from maintenance of the <br />PROJECT or a portion thereof. <br />Upon WORK completion, ownership or title to all materials and equipment constructed or installed <br />for the operations and/or maintenance of the State Highway System (SHS) within SHS right- <br />of-way as part of WORK become the property of CALTRANS. <br />CALTRANS will not accept ownership or title to any materials or equipment constructed or <br />installed outside SHS right-of-way. <br />ATTY/AGR.2024.134/Caltrans and IQHQ (Elco Yards Highway Improvement Agreement)(REV: 08-20-24 VR) (Page 12 of 22) <br />6.K. - Page 24 of 67 <br />408