My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt24 Casey Construction, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2024
>
Agmt24 Casey Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2024 1:24:54 PM
Creation date
9/27/2024 1:23:19 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
2023-2024 Watermain Replacement Project
RMP File Number
304
Date
9/25/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
16. <br />8" PVC Connection to Existing 6" <br />13 <br />EA <br />$ 6-1 <br />$ 7s,�Ioo <br />17. <br />8" PVC Connection to Existing 8" <br />11 <br />EA <br />$ (a 00v <br />$ �bi DOO <br />18. <br />8" PVC Connection to Existing 10" <br />1 <br />EA <br />$ 161 (opo <br />$ (0,(000 <br />19. <br />8" PVC Connection to Existing 12" <br />2 <br />EA <br />$ 00,000 <br />$ f (a, 000 <br />20. <br />12" PVC Connection to Existing 10" <br />1 <br />EA <br />$ 7, 000 <br />$ 7, Qd0 <br />21. <br />12" PVC Connection to Existing 12" <br />1 <br />EA <br />$ 7,000 <br />$ -7, QQp <br />22. <br />12" Watermain Temporary Tie-in and <br />Abandonment (Approx. STA 17+21 <br />Farm Hill Blvd)" <br />1 <br />EA <br />$,)a A00 <br />' <br />$ a,a a00 <br />23. <br />Valve Box Removal and Restoration <br />55 <br />EA <br />$ #00 <br />$ 3�, 000 <br />Total Bid Price <br />`4 7&F #61 <br />"See Section 01 1150 Construction Sequence forspecia) requirements <br />In case of discrepancy between the Unit Price and the Total Item Cost set forth for a unit basis <br />item, the unit price shall prevail and shall be utilized as the basis for determining the lowest <br />responsive, responsible Bidder. However, if the amount set forth as a unit price is ambiguous, <br />unintelligible or uncertain for any cause, or is omitted, or is the same amount as the entry in the <br />"Total Item Cost" column, then the amount set forth in the "Total Item Cost" column for the item <br />shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained <br />shall be the Unit Price. <br />For purposes of evaluating Bids, the City will correct any apparent errors in the extension of unit <br />prices and any apparent errors in the addition of lump sum and extended prices, <br />5. The undersigned acknowledges that the Apparent Low Bidder will be determined as <br />provided in Documents 00 1113 (Notice to Bidders) and Document 00 2113 (Instruction <br />to Bidders). <br />6. Subcontractors for work are listed on Document 00 4314 (Subcontractors List), submitted <br />herewith. <br />7. The undersigned Bidder understands that City reserves the right to reject this Bid. <br />BID FORM 004113-3 <br />2023-2024 Watermain Replacement Project - Cambridge and Emerald Hills <br />
The URL can be used to link to this page
Your browser does not support the video tag.