My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt24 Casey Construction, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2024
>
Agmt24 Casey Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2024 1:24:54 PM
Creation date
9/27/2024 1:23:19 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
2023-2024 Watermain Replacement Project
RMP File Number
304
Date
9/25/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SCHEDULE OF BID PRICES <br />All Bid items, including lump sums, unit prices and alternates (if any), must be filled in completely. <br />Bid items are described in Section 01 1100 (Summary of Work). Quote in figures only, unless <br />words are specifically requested. <br />Item <br />Description <br />p <br />Estimated <br />Quantity Unit <br />Unit Price <br />Total Item <br />Cost <br />Mobilization, Demobilization, Traffic <br />Control, Construction Layout, <br />1. <br />Notification & Incidentals (Maximum <br />1 LS <br />$ �'gp coo <br />$ MX00 <br />5% of the Total Base Bid, Items 1 <br />through 23) <br />Sheeting, shoring and bracing for all <br />2 <br />trenching and excavation work in <br />accordance with California Labor Code <br />1 LS <br />$ lq� ' I Q� <br />t <br />$ 1 q) -t ft <br />Section 6707 <br />3. <br />8 -inch C900 PVC Watermain <br />6787 LF <br />$ of 3 <br />$ �� 1049, -aw <br />4. <br />12 -inch C900 PVC Watermain <br />980 LF <br />$ of 7 <br />$ <br />5. <br />6 -inch Gate Valve <br />5 EA <br />$ '� 80� <br />$01,00o <br />6. <br />8 -inch Gate Valve <br />19 EA <br />$ a� �4'po <br />$ 5 6GID <br />7. <br />12 -inch Butterfly Valve <br />2 EA <br />$ 3 00 <br />$ (000 <br />B. <br />2 Water Service and Yard Piping <br />Connected to New PVC Main <br />146 EA <br />$5 5DU <br />$ g03, ow <br />9 <br />2" Water Service and Yard Piping <br />Connected to Existing Watermain <br />11 EA <br />$ %� a0 0 <br />$ %(�� OliO <br />10. <br />Fire Hydrant on New PVC Watermain <br />16 EA <br />$15-," S00 <br />y.00 000 <br />11, <br />Fire Hydrant on Existing PVC Main <br />(with tapping sleeve) <br />1 EA <br />$17,000 <br />$ /7,000 <br />12. <br />Existing Fire Hydrant Removal <br />7 EA <br />$'f c�Op <br />$ 6, jy00 <br />13. <br />Fire Hydrant and ARV Enclosure <br />(Approx. STA 3+00 Glenloch Way -3) <br />1 EA <br />$ /5, O0C) <br />$ /5,-00,0 <br />14 <br />Reconnect Existing 4" Water Service <br />(3790 Red Oak Way) <br />1 EA <br />$OUO <br />$ o?.] OpU <br />, <br />15. <br />Combination Air Release Valve <br />4 EA <br />$ ,, 000 <br />$ o%S. OLIO <br />Assemblv <br />BID FORM <br />004113-2 <br />2023-2024 Watermain Replacement Project - Cambridge and Emerald Hills <br />
The URL can be used to link to this page
Your browser does not support the video tag.