<br /> <br />MANPOWER ALLOCATION <br />Consultant has provided the manpower allocation by task in the table below. <br /> <br />Notes: <br />(a) Labor hours for surveying, utility locating, and potholing (performed by Subconsultants Psomas and Geologic) are not included <br />above. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />TASKS <br />Consultant Labor Subconsultant <br />Labor (Bennett) (a) <br />Combined <br />Total G5 - Ana Kirkwood G3 - Jordan Gans, EIT G2 - Christopher Pittner, PE, QISP SUP2 - Tyler Colyer, PE - QA/QC SUP1 - Jonathan Sutter, PE PRI - David Umezaki, PE Senior PM - Matthew Wallin Associate Engineer <br />Task 1 - Project Management <br />and Coordination 0 24 21 0 93 11 10 4 163 <br />Task 2 - Surveying, Utilities <br />Research, and Geotechnical <br />Investigation <br />0 24 20 4 12 3 8 20 91 <br />Task 3 - 60% Design Submittal <br />(Including Basis of Design) 12 192 50 22 45 5 108 122 556 <br />Task 4 - 90% Design Submittal 10 70 20 10 15 2 40 36 203 <br />Task 5 - Final Design (100% <br />Design Submittal) 4 32 10 6 6 2 24 12 96 <br />Task 6 - Bid Support and <br />Construction Services 0 154 52 30 27 2 44 26 335 <br /> TOTAL: 26 496 173 72 198 25 234 220 1,444 <br />ATTY/AGR.2024.152/EKI Environment and Water, Inc. (Redwood City Downtown Recycled Water Extension) (Page 17 of 23)