Laserfiche WebLink
ATTY/ORD.0010/CC ORD AMENDING MUNI CODE CH.18, 27A, 30 – EXHIBIT B <br />REV: 09-17-24 VR <br />Page 2 of 4 <br />be amended from time to time. The design and implementation of the PSPPM must be in <br />accordance with the guidelines and technical specifications provided by the City or other <br />City-approved authority and the requirements of Order No. R2-2015-0049. The design and <br />implementation of the PSPPM must also incorporate green infrastructure designed to limit <br />contributions of urban runoff pollutants to San Francisco Bay per the MRP. <br /> <br />SITE DESIGN MEASURES: Shall mean site planning techniques to conserve natural spaces <br />and/or limit the amount of impervious surface at new development and significant <br />redevelopment projects in order to minimize runoff and the transport of pollutants in runoff. <br /> <br />SOURCE CONTROL MEASURES: Shall mean any schedules of activities, structural devices, <br />prohibitions of practices, maintenance procedures, managerial practices or operational <br />practices that aim to prevent stormwater pollution by reducing the potential for pollution at <br />its source. <br /> <br />STORMWATER TREATMENT MEASURES: Shall mean any engineered system designed to <br />remove pollutants from stormwater by simple gravity settling of particulate pollutants, <br />filtration, biological uptake, media adsorption or any other physical, biological, or chemical <br />process. <br /> <br />Sec. 27A.37. - PERMANENT STORMWATER POLLUTION PREVENTION MEASURES <br />REQUIRED: <br /> <br />A. All C.3 Regulated Stormwater Treatment Projects shall include permanent stormwater <br />pollution prevention measures in order to reduce water quality impacts of stormwater runoff <br />from the entire site for the life of the project. <br /> <br />1.C.3 Regulated Projects that result in an increase of, or replacement of, more than <br />fifty percent (50%) of the impervious surface of a previously existing development <br />shall include permanent stormwater pollution prevention measures sufficient to <br />reduce water quality impacts of stormwater runoff from the entire site for the life of <br />the project. <br /> <br />2.C.3 Regulated Projects that result in an increase of, or replacement of, fifty percent <br />(50%) or less of the impervious surface of a previously existing development shall <br />include permanent stormwater pollution prevention measures sufficient to reduce <br />water quality impacts of stormwater runoff from the increased or replaced portion of <br />the site for the life of the project. <br /> <br />B. Stormwater treatment measure proposed as part of a project's permanent stormwater <br />pollution prevention measures shall be designed in accordance with the following hydraulic <br />sizing criteria to treat stormwater runoff. <br />