Laserfiche WebLink
Agreement 04-2958 <br />Project No. 0424000060 <br />Project Development Agreement 2017-02-17/HIA (Created October 5, 2023) 11 of 22 <br />In the event of any breach or default in performance by PERMITTEE, CALTRANS will look <br />to the Performance Bond surety to either complete the PROJECT or place the State Highway <br />System in a satisfactory operational condition and then cover all expenses incurred by <br />CALTRANS in completing the PROJECT. CALTRANS will bill PERMITTEE for any <br />additional expenditure not covered by the surety. PERMITTEE agrees to pay said expenses <br />within thirty (30) days. <br />56. CALTRANS will not issue an encroachment permit to PERMITTEE for construction work <br />until the following conditions are met: <br />• CALTRANS accepts the final plans, specifications, and estimate <br />• CALTRANS accepts the Right-of-Way Certification <br />• CALTRANS accepts the CONSTRUCTION Quality Management Plan <br />• Any new or amended maintenance agreements required for the WORK are executed <br />57. PERMITTEE will require the construction contractor to furnish payment and performance <br />bonds naming PERMITTEE as obligee, and CALTRANS as additional obligee, and to carry <br />liability insurance in accordance with CALTRANS Standard Specifications. <br />58. CALTRANS will review and concur with: <br />• Change Orders affecting public safety, public convenience, protected environmental <br />resources, the preservation of property, all design and specification changes, and all <br />major changes as defined in the CALTRANS Construction Manual. These Change <br />Orders must receive written concurrence by CALTRANS prior to implementation. <br />• The Stormwater Pollution Prevention Plan (SWPPP) or the Water Pollution Control Plan <br />(WPCP). <br />59. PERMITTEE is designated as the Legally Responsible Person pursuant to the Construction <br />General Permit, State Water Resources Control Board (SWRCB) Order Number 2009-0009- <br />DWQ, as defined in Appendix 5, Glossary, and assumes all roles and responsibilities assigned <br />to the Legally Responsible Person as mandated by the Construction General Permit. <br />PERMITTEE is required to comply with the CALTRANS MS4 National Pollutant Discharge <br />Elimination System (NPDES) permit for all work within the State Highway System.