Laserfiche WebLink
·. <br />Permittee shall assume the defense of and indemnify and save <br />harmless the City and County of San Francisco, its Public <br />Utilities Commission, officers, and employees from all claims, <br />loss liens, damage, injury, and liability of every kind, nature <br />and description, directly or indirectly arising from Permittee's <br />occupation and use of City lands pursuant to his permit except <br />where caused exclusively by negligence of City, its agents or <br />employees. <br />23. Permittee's improvements shall not be the cause of ponding on <br />Premises nor the cause of flooding on adjacent land. Permittee <br />shall be responsible and liable for all claims of personal <br />and/or property injuries resulting from said ponding or flooding. <br />24. Permittee shall protect the existing blow off valve and shall <br />not fence the area under permit. <br />25. Permittee shall exercise extreme care in the use of any tools <br />and equipment in the course of any work permitted hereunder so <br />as to not damage or injure City's pipelines or appurtenances. <br />Permittee's use of vehicles and construction equipment within <br />twenty (20) feet of City's pipelines shall be restricted as <br />follows: <br />a. Minimal cover over the pipelines shall be three <br />(3) feet. <br />b. "Axle loading" of vehicles and construction <br />equipment shall not exceed "AASHO Standard H-10 <br />Loading", H-10 loading is defined as loading <br />caused by a two axle truck with a gross weight of <br />ten tons (20,000 lbs.), axles 14 feet apart, and <br />rear axle carrying 8 tons (16,000 lbs.). It is <br />Permittee's responsibility to provide <br />substantiation that his equipment meets this <br />requirement. Should this loading requirement prove <br />to be inadequate protection for the pipelines, a <br />more stringent limitation should be effective upon <br />City's notice to Permittee. <br />c. The use of vibrating compaction equipment is <br />prohibited. <br />26. Permit drawing attached and made a part of this permit shows the <br />location of all City's pipeline right-of-way survey monuments. <br />These monument points are noted in the drawings as "Existing" <br />for monuments in place, and "Missing" for monuments not in place. <br />In accepting this permit, Permittee acknowledges that "existing" <br />monuments are in good condition .. During the term of this <br />permit, Permittee shall assume full responsibility for <br />protecting "existing" monuments from dislocation, damage and <br />destruction. <br />Permittee agrees to reimburse City in the amount of $750.00 for <br />each monument necessitating resurvey, repair and/or replacement. <br />During the term of this permit, the City may replace "missing" <br />monuments, or install new monuments. When "missing" monuments <br />are replaced, or new monuments installed, the Permittee will be <br />given written notice and thereafter Permittee shall assume the <br />same protection and reimbursement responsibilities as with <br />"existing" monuments provided herebefore. <br />27. This permit shall commence June 1, 1987 and shall be subject to <br />annual review unless revoked sooner, pursuant to hereinabove <br />Condition No. 2. <br />28. Prior to the termination of this permit, Permittee shall remove <br />its materials, including all waste and debris, and restore the <br />area to its original condition to the satisfaction of the <br />Manager of the San Francisco Water Department.