Laserfiche WebLink
ATTY/RESO.0091/PC RESO 800 MAIN HOTEL SEQUOIA <br />REV: 09-01-23 VR <br />Page 12 of 32 <br />activities and achievements to the Public Works Department annually as <br />requested. <br /> <br />22. Agreements - Prior to Building Permit issuance, enter into the following agreements <br />with the City in a form acceptable to the City Attorney and the Community <br />Development & Transportation Director: [COA][ENGINEERING] <br />a. A Landscape Maintenance Agreement for all assigned landscape areas <br />in public rights of way, easements, and/or on property in which the City <br />holds an interest. Maintenance items shall include, but are not limited to, <br />planting trees, shrubs, flowers, grass and all appurtenances including <br />irrigation systems and pedestrian scale lighting. <br /> <br />b. A Stormwater Treatment Measures Maintenance Agreement for all on- <br />site stormwater treatment measures associated with the project. <br /> <br />c. An Improvement Agreement to guarantee the installation of all <br />improvements required of the project and to provide for payment of all City <br />inspection and plan check charges associated with the installation of public <br />and private improvements, including, but not limited to, streets, sanitary <br />sewers, water, storm drains and streetlights. <br /> <br />Reports and Surveys <br /> <br />23. Geotechnical Report - Include a geotechnical field review and reports for all grading <br />work, prepared by a licensed geotechnical engineer and in conformance with <br />Engineering Standards, Volumes II & III, CBC, and other State regulations. This <br />shall be submitted as part of the building permit application. [SDR][ENGINEERING] <br /> <br />24. As-Builts – Provide “as-built” or “record” drawings, to be submitted in paper, PDF <br />and AutoCAD formats prior to project sign-off. [COA][ENGINEERING] <br /> <br />25. Transportation Demand Management Program – A final Transportation Demand <br />Management (TDM) program, describing the elements to be implemented, shall be <br />reviewed and approved prior to certificate of building occupancy. The TDM program <br />shall include an annual reporting requirement for the first three years that details <br />daytime parking utilization rates and employee use and awareness of the program. <br />Annual reporting shall begin on December 1 of each year. Project also shall Comply <br />with C/CAG requirements by providing the applicable checklist and participating in <br />the Commute.org’s Certified Development Program. [COA][ENGINEERING] <br />FEMA and Base Flood Elevations <br />26. Elevation Certificate – Prior to certificate of occupancy, the elevation of the lowest <br />floor (including basement when applicable) shall be certified by a registered <br />professional engineer or land surveyor, verified by the City’s Building Inspector to