My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso 23-21 0097 PC23-21 PC Reso 1 Twin Dolphin
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2023
>
Reso 23-21 0097 PC23-21 PC Reso 1 Twin Dolphin
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2024 2:47:17 PM
Creation date
10/21/2024 2:47:09 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
10/21/2024 2:47 PM
Modified:
10/21/2024 2:47 PM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH18LOIMPL_ARTXVTRIMFE
ID:
2
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
10/21/2024 2:47 PM
Modified:
10/21/2024 2:47 PM
Text:
https://www.redwoodcity.org/departments/administrative-services/finance-/taxes-assessments/master-fee-schedule
ID:
3
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
10/21/2024 2:47 PM
Modified:
10/21/2024 2:47 PM
Text:
https://www.redwoodcity.org/departments/administrative-services/finance-/taxes-assessments/master-fee-schedule
ID:
4
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
10/21/2024 2:47 PM
Modified:
10/21/2024 2:47 PM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH18LOIMPL_ARTXVIPAIMFE
ID:
5
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
10/21/2024 2:47 PM
Modified:
10/21/2024 2:47 PM
Text:
https://library.municode.com/ca/redwood_city/codes/code_of_ordinances?nodeId=CH45PUAR
ID:
6
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
10/21/2024 2:47 PM
Modified:
10/21/2024 2:47 PM
Text:
https://www.redwoodcity.org/home/showpublisheddocument/7220/635875027459100000
ID:
7
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
10/21/2024 2:47 PM
Modified:
10/21/2024 2:47 PM
Text:
https://www.seq.org/DEPARTMENTS/Administrative-Services/Maintenance--Operations/School-Impact--Developer-Fees/index.html
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0097/PC RESO 1 TWIN DOLPHIN <br />REV: 10-04-23 VR <br />Page 11 of 23 <br />Fees <br />The following fees must be paid in full prior to issuance of the building permit unless otherwise described <br />below, or the applicant elects to defer payment to certificate of occupancy in accordance with <br />Government Code Section 66007 and complies with all requirements of that section. <br /> <br />6. Transportation Impact Fee - Pay a Traffic Impact Fee for the net new trips resulting from the <br />proposed project, estimated at $192,210.30. [SDR] [ENGINEERING] <br />7. Water Fees – Pay applicable water fees as outlined on the Master Fee Schedule, including but not <br />limited to, Water Capacity Charge, Water System Capital Facilities Fee, Water Service Tap Fee, and <br />Water Meter Installation Fee, estimated at $522,199.14. Final fee amounts will be determined <br />based on the final, approved, project plans. [SDR, MC 38.14][ENGINEERING] <br />8. Sewer Fees – Pay applicable sewer fees as outlined on the Master Fee Schedule, including but not <br />limited to, Sewer System Capital Facilities Fee and Wastewater Treatment Capacity Fee, estimated <br />at $332,308.12. Final fee amounts will be determined based on the final, approved, project plans. <br />[SDR, MC 27.101.A & B][ENGINEERING] <br />9. 101/84 Interchange Project Fair Share Contribution – Pay a fair share contribution for the net <br />new trips resulting from the proposed project towards the construction cost of the 101/84 <br />Interchange which is not included in the Transportation Impact Fee, estimated at $1,169,401 based <br />on 197,520 square feet of commercial space. Payment is due prior to the issuance of Building <br />Permits. [SDR][ENGINEERING] <br />10. Parks Impact Fee – Pay a Parks Impact Fee for the net new commercial square footage resulting <br />from the proposed project, estimated at $769,422.40. [SDR][PARKS] <br />11. Public Art Fee – Art in Public Places Fee: The proposed project is over 50,000 square feet and must <br />either provide on-site public art with a valuation of at least 1% of the construction value of the <br />project or make a contribution to the City of its Art in Public Places Fund. The in-lieu fee must be <br />equal to a minimum of 1% of the construction valuation, or if the public art is provided on-site and <br />does not reach the minimum, the project must pay the difference between 1% of the construction <br />valuation and the value of art provided on-site, consistent with Chapter 45 Section 45.090 of the <br />Municipal Code. The applicant must either obtain an approved public art permit or pay the in-lieu <br />fee prior to issuance of any building permit for the project. [SDR] [PARKS] <br />12. Affordable Housing Impact Fee – Pay an Affordable Housing Impact Fee for the net new commercial <br />square footage calculated at 136,365 sq. ft. from the proposed project, estimated at $3,220,940.30. <br />[SDR][HOUSING] <br /> <br />13. School Impact Fee – For residential additions greater than 500 square feet and new commercial or <br />industrial construction, pay a School Impact Fee to the Sequoia Union High School District. <br />Information regarding this fee may be obtained by contacting the Sequoia Union High School District <br />at (650) 369-1411. [SDR][SCHOOL DISTRICT] <br />
The URL can be used to link to this page
Your browser does not support the video tag.