Laserfiche WebLink
4855-3069-9660 v1 <br />36.C3 Requirements - Plans shall be designed to meet C3 requirements of the Municipal Regional <br />Permit (MRP) NPDES Permit CAS612008 and be in compliance with San Mateo County C.3 <br />Stormwater Technical Guidance. [SDR][ENGINEERING] <br />a.Treatment Controls – Treatment measures to be shown on final improvement or grading <br />plans shall not differ materially from the treatment measures presented on the project’s <br />Vesting Tentative Map, approved on December 5, 2023, without written approval from <br />the Engineering Department. <br />b.Treatment Measure Inspection – Applicant shall coordinate installation of stormwater <br />treatment measures with the municipality, shall arrange to have the City’s designated <br />inspector present at the time of installation, and shall have the City’s designated inspector <br />complete a final inspection of installed stormwater treatment measure immediately after <br />installation is complete. <br />37.Stormwater Management Plan (SWMP) – Applicant shall prepare a SWMP that includes, at a <br />minimum, exhibit(s) showing drainage areas and location of Low Impact Development (LID) <br />treatment measures; total project site area and total area of land disturbed; total new and/or <br />replaced impervious area; treatment measures and hydraulic sizing calculations; a listing of source <br />control and site design measures to be implemented at the site; saturated hydraulic conductivity <br />rate(s) at relevant locations or hydrologic soil type (A, B, C or D) and source of information; elevation <br />of high seasonal groundwater table; and a brief summary of how the project is complying with <br />Provision C.3 of the MRP. [COA][ENGINEERING] <br />38.Construction General Permit – For construction activity resulting in a land disturbance of one acre <br />or more, applicant shall file a Notice of Intent (NOI) with the State Water Resources Control Board <br />under the Construction Activities Storm Water General Permit (General Permit). The NOI indicates <br />the applicant’s intent to comply with the San Mateo Countywide Stormwater Pollution Prevention <br />Program, including a Stormwater Pollution Prevention Plan (SWPPP). [SDR] [ENGINEERING] <br />39.Stormwater BMPs - Stormwater Pollution Prevention Program Best Management Practices (BMPs) <br />for construction shall be implemented to protect water quality, in accordance with the approved <br />Stormwater Pollution Prevention Plan (SWPPP). BMP plan sheets are available electron ically for <br />inserting into project plans. [SDR][ENGINEERING] <br />Street Infrastructure Improvements <br />40.Remainder Parcels and Parcels Not Being Developed – Any frontage improvements provided for <br />remainder parcels or parcels not being developed by this tentative map, are not considered to have <br />been constructed to serve such remainder parcels or parcels not being developed. Improvements <br />to facilitate development of such parcel(s) will be required as a condition of future development of <br />such parcel(s), and will be subject to those design standards in place at that future time. All frontage <br />improvements for the parcels being developed as part of this tentative map shall be properly <br />designed and constructed to current engineering design standards. <br />41.Broadway Traffic Calming Through Striping Plan: A striping plan for Broadway between Douglas <br />and 2nd Avenues shall be included as part of the building permit package submittal and approved by <br />the City Engineer. The striping Plan shall reflect the need for pedestrian safety improvements and <br />traffic calming on Broadway. The striping plan could include repurposing the travel lanes and adding <br />median. [COA] [ENGINEERING] <br />ATTY/RESO.0110/PC RESO STANFORD BLOCK C - EXHIBIT A & B <br />REV: 11-30-23 VR <br /> <br />Page 7 of 20