My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso23-22 0110 PC23-22 PC Reso Stanford Block C
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2023
>
Reso23-22 0110 PC23-22 PC Reso Stanford Block C
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2024 2:49:01 PM
Creation date
10/21/2024 2:48:50 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4855-3069-9660 v1 <br />•Project-Specific Measures: <br />o For construction, off-road equipment shall be Tier 4 or shall achieve Tier 4 particulate <br />matter emission levels through use of one or more of the following: Tier 2/Tier 3 <br />equipment with diesel particulate filters; alternative fuels (e.g., biodiesel or liquefied <br />natural gas); and/or electrification. <br />o For each phase of project construction, the applicant shall maintain ROG emission <br />below 54 pounds per day. The applicant may demonstrate compliance with this limit <br />through one or more of the following: strategic project phasing, use of pre-coated <br />building materials, and/or use of low-VOC coatings beyond the requirements of <br />BAAQMD Regulation 8, Rule 3. <br />Precise Plan EIR Mitigation Measure 8-2: In addition to the project-proposed sustainability measures <br />described in chapter 3 (Project Description) of this EIR, which include a Transportation Demand <br />Management (TDM) program, implement the following measure: <br />•Minimize generator testing to reduce ROG emissions. Generator emissions, as computed on <br />an annual basis, shall be reduced by 30 percent or greater. This could be achieved in a <br />number of ways: <br />o Install fewer than the assumed 13 generators; <br />o Install generators with lower emissions (in this case, smaller generators); <br />o Test generators at lower running loads (the analysis assumed 100-percent load, so <br />50-percent load would reduce emissions); and/or <br />o Reduce the number of annual testing hours annually. The applicant shall submit an <br />analysis of the generator emissions prior to installing more than five generators at the <br />project development site. <br />Precise Plan EIR Mitigation Measure 9-1: For all new development on the project development site, the <br />City shall ensure that the development complies with the most current Redwood City General <br />Plan and Redwood City Municipal Code requirements for protection from flood hazards, <br />consistent with Mitigation 10-3 in chapter 10 (Utilities), of this EIR. These provisions would require <br />compliance with associated storm drainage storage, building elevation, and flood-proofing <br />requirements. Implementation of these measures would be expected to reduce this impact to a <br />less-than- significant level. <br />Precise Plan EIR Mitigation Measure 10-2: At the time that construction of net new square footage on <br />the project development site is proposed, the applicant’s engineer shall work with Fair Oaks <br />Sewer Maintenance District (FOSMD) and the San Mateo County Engineering Department to <br />verify that the local FOSMD sewer network, particularly lines 100 and 200, has adequate capacity <br />for the proposed increment of development’s peak wastewater flow rate. If an inadequacy is <br />found and the proposed increment of development represents the entire cause of the capacity <br />shortfall, the applicant shall bear full responsibility for fundi ng the required improvements to <br />FOSMD's system; if the proposed increment of development does not represent the entire cause <br />of such an incapacity, the applicant shall pay its fair share of the cost of such improvements. <br />Precise Plan EIR Mitigation Measure 10-3: The project shall not increase off-site flooding compared to <br />existing conditions. Finished grades within the portions of the project development site located <br />ATTY/RESO.0110/PC RESO STANFORD BLOCK C - EXHIBIT A & B <br />REV: 11-30-23 VR <br /> <br />Page 16 of 20
The URL can be used to link to this page
Your browser does not support the video tag.