Laserfiche WebLink
ATTY/RESO.0025/ PC APPROVING AP 2020-060 <br />REV: 03-31-2023 JB <br />Page 10 of 18 <br />14. Resurface Parking Lot – Slurry-seal and restripe the parking lot. This work shall be <br />included as part of the building permit plans. [COA][PLANNING] 15. Discards Collection - Prior to the issuance of a building permit, the applicant shall <br />submit to Engineering a Discards Collection Plan for review and approval. The plan <br />shall include the following elements and additional elements as required by City <br />staff: [COA][ENGINEERING] a. Maintenance and Service: Trash, recycling and composting <br />(Discards) storage areas shall include adequate space for the maintenance <br />and servicing of containers for all materials that are provided by local <br />hauling companies. b. Adequate Space for Trash, Recyclables and <br />Compostables: The amount of space provided for the collection and <br />storage of recyclable materials shall be at least as large as the amount of <br />space provided for the collection and storage of trash materials and shall <br />reflect the estimated volumes of trash and recyclable and compostable <br />materials to be generated providing for the separate and dedicated <br />containers for those materials with the goal of 25% or less of the total <br />materials generated going to a landfill. An appropriately sized and designed <br />area for wastes banned from regular trash containers such as electronics, <br />fluorescent lamps and batteries shall be designated. Residential properties <br />will also provide area for bulky item collection such as mattresses, furniture, <br />tires and white goods. This shall be reflected in the Discards Collection <br />Plan. c. Convenience and Accessibility: The recycling area shall be <br />at least as accessible and convenient for tenants and collection vehicles as <br />the trash collection and storage area. Separate, properly labeled (as per <br />City standards) and dedicated chutes must be provided for each and every <br />collected stream of materials - not just for trash (non-recyclable and non- <br />compostable materials) if chutes are planned. The trash and recycling <br />room(s) or areas shall be located on an exterior wall of the building (if <br />indoors) with adequately-sized door or gate access to the street through the <br />wall so as to minimize distance for the collection vehicle personnel and <br />eliminate temporary outdoor storage of containers on collection days. If the <br />storage area is located outside, then it must be easily accessible by the <br />collection vehicles. If the day-to-day-use trash and recycling area(s) cannot <br />be located adjacent to the street, then service-day locations easily <br />accessible by the collection vehicle staff must be provided in an area on- <br />site as per city standards in enclosures completely screened and covered <br />from off-site view by a solid fence or masonry wall at least six feet high and <br />in harmony with the architecture of the building(s). d. Equipment/Storage: All trash enclosures shall be completely <br />screened and covered from off-site view by a solid fence or masonry wall at <br />least six feet high and in harmony with the architecture of the