My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso 23-04 0025 C Reso Approving AP2020-060 2336 El Camino Real
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2023
>
Reso 23-04 0025 C Reso Approving AP2020-060 2336 El Camino Real
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2024 2:56:24 PM
Creation date
10/21/2024 2:56:19 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Date
4/4/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0025/ PC APPROVING AP 2020-060 <br />REV: 03-31-2023 JB <br />Page 12 of 18 <br />Reports and Surveys <br /> 18. Geotechnical Report - Include a geotechnical field review and reports for all grading <br />work, prepared by a licensed geotechnical engineer and in conformance with <br />Engineering Standards, Volumes II & III, CBC, and other State regulations. This <br />shall be submitted as part of the building permit application. [SDR][ENGINEERING] <br /> 19. As-Builts – Provide “as-built” or “record” drawings, to be submitted in paper, PDF <br />and AutoCAD formats prior to project sign-off. [COA][ENGINEERING] <br /> <br />Utility Infrastructure Improvements 20. Conformance with the City’s Engineering Standards – All public improvements <br />shall be designed and constructed in accordance with the City’s Engineering <br />Standards. [SDR][ENGINEERING] 21. Encroachment Permits – Obtain an Encroachment Permit from the Engineering <br />and Transportation Division for work listed below. This permit shall be obtained prior <br />to the commencement of construction of the road, utilities, or any site improvements. <br />[SDR][ENGINEERING] a. Work in the City public right-of-way, easements or property in <br />which the City holds an interest. b. Work requiring a grading permit. Grading permits require a <br />Plot and Finished Grading Plan prepared by a California-registered Civil <br />Engineer. c. Work requiring on-site shoring which affects the public right of <br />way d. Work using the public right-of-way for any fixed structure <br />(awnings, roof overhangs, fixed planters, etc.). Insurance, meeting the <br />City’s standards, is required. This permit will be recorded against the <br />property. <br /> 22. Undergrounding Utilities - The applicant shall underground all overhead utilities <br />along Hemlock Avenue and Linden Street project frontage, which shall be shown on <br />the building permit plans. [SDR][ENGINEERING] 23. Sewer Capacity – Prior to encroachment permit issuance, submit to the City, and <br />obtain approval of, an evaluation and report prepared by a licensed engineer <br />demonstrating that the existing sewer mains have sufficient capacity for the project. <br />The study shall consider existing, project, other approved projects, and applications <br />currently under review in determining the needed capacity. If the existing sewer main <br />is less than 6” in size, or is in any other way not sufficient as determined by the City <br />Engineer, applicant shall, as part of the Project, construct and install new sewer <br />mains sufficient to meet such requirements, in accordance with the City's <br />Engineering standards and as directed by the City Engineer to the City Engineer's <br />satisfaction. [SDR][ENGINEERING]
The URL can be used to link to this page
Your browser does not support the video tag.