My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso24-01 0013 PC Reso 879 Vista Dr
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2024
>
Reso24-01 0013 PC Reso 879 Vista Dr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2024 2:59:05 PM
Creation date
10/21/2024 2:59:02 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Agency Type
Planning Commission
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
10/21/2024 2:59 PM
Modified:
10/21/2024 2:59 PM
Text:
https://library.municode.com/ca/redwood_city/codes/city_code?nodeId=CH18LOIMPL_ARTXIVLODEST_S18.240STIMTR
ID:
2
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
10/21/2024 2:59 PM
Modified:
10/21/2024 2:59 PM
Text:
https://library.municode.com/ca/redwood_city/codes/city_code?nodeId=CH18LOIMPL_ARTXIVLODEST_S18.240STIMTR
ID:
3
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
10/21/2024 2:59 PM
Modified:
10/21/2024 2:59 PM
Text:
https://www.municode.com/library/ca/redwood_city/codes/code_of_ordinances?nodeId=CH29STSIWOUSRI-W_ARTIIICORESIDR
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0013/PC RESO 879 VISTA DR – EXHIBIT A <br />REV: 03-05-24 VR <br />Page 4 of 5 <br />21. Stormwater BMPs - Stormwater Pollution Prevention Program Best Management Practices <br />(BMPs) for construction shall be implemented to protect water quality, in accordance with the <br />approved Stormwater Pollution Prevention Plan (SWPPP). BMP plan sheets are available <br />electronically for inserting into project plans. [SDR][ENGINEERING] <br />Street Infrastructure Improvements 22. Repair or Replace Street Infrastructure - Restore streets surrounding the project site to the <br />satisfaction of the City Engineer at project completion. When this requires additional pavement <br />restoration, the Engineer shall approve the preferred layout of pavement markings. <br />[SDR][ENGINEERING] 23. Sidewalk/Curb/Gutter Extension - The project shall construct new 5’ wide decomposed granite <br />sidewalk, curb, gutter along the property frontage on Vista Drive. The new sidewalk, curb, and <br />gutter shall tie into the existing improvements as shown on the Tentative Parcel Map, prepared <br />by MacLeod and associates, dated 6/20/2023. [SDR][ENGINEERING] <br />Construction-Related Activities 24. Pre-Construction Meeting - After City permits are approved, but prior to start of construction, <br />hold a preconstruction conference with Engineering and Building staff and other interested <br />parties. The developer shall arrange for the attendance of the construction manager, contractor, <br />and all subcontractors who are responsible for grading and erosion and sedimentation protection <br />controls. [COA][ENGINEERING] 25. Construction Management and Staging - Prior to encroachment permit issuance, submit a <br />construction parking management plan, which shall outline the number of construction workers <br />by phase, phase duration, where parking will be located for each phase. Construction parking, <br />material storage, equipment, or other construction-related uses are not allowed within the City <br />right of way without prior approval from the City Engineer. [COA][ENGINEERING] 26. Lane Closures - Traffic control for lane closures shall conform to the Work Area Traffic Control <br />Handbook. Street closures require submission of traffic control plans and approval in advance. <br />[SDR][ENGINEERING] 27. Winterizing - If construction is not complete by the start of the wet season (October 1 through <br />April 30), implement a winterization program to minimize the potential for erosion and <br />sedimentation. As appropriate to the site and status of construction, winterization requirements <br />shall include inspecting/maintaining/cleaning all soil erosion and sedimentation controls prior to, <br />during, and immediately after each storm event; stabilizing disturbed soils through temporary or <br />permanent seeding, mulching, matting, tarping or other physical means; rocking unpaved vehicle <br />access to limit dispersion of much onto public right-of-way; and covering/tarping stored <br />construction materials, fuels, and other chemicals. Plans to include proposed measures to <br />prevent erosion and polluted runoff from all site conditions shall be submitted for approval by <br />CDD prior to beginning construction. As site conditions warrant, the City Engineer may direct the <br />applicant to implement additional winterization requirements. [COA][ENGINEERING]
The URL can be used to link to this page
Your browser does not support the video tag.