My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso24-05 0025 - PC Reso Adopt Amendments To The Zoning Code 2023 2031 Housing Element
RedwoodCity
>
City Clerk
>
Resolutions
>
Planning Commission
>
2024
>
Reso24-05 0025 - PC Reso Adopt Amendments To The Zoning Code 2023 2031 Housing Element
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/21/2024 3:03:35 PM
Creation date
10/21/2024 3:02:41 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
Planning Commission
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
10/21/2024 3:03 PM
Modified:
10/21/2024 3:03 PM
Text:
https://library.municode.com/ca/redwood_city/ordinances/zoning_code?nodeId=1111200
ID:
2
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
10/21/2024 3:03 PM
Modified:
10/21/2024 3:03 PM
Text:
https://library.municode.com/ca/redwood_city/codes/zoning_code?nodeId=ART37ACDWUN
ID:
3
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
10/21/2024 3:03 PM
Modified:
10/21/2024 3:03 PM
Text:
https://library.municode.com/ca/redwood_city/codes/zoning_code?nodeId=ART29REAFHO_29.4REINAFHO
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
163
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />ATTY/RESO.0025/PC RESO ADOPT AMENDMENTS TO THE ZONING CODE – 2023-2031 HOUSING ELEMENT – EXHIBIT A <br />REV: 06-20-24 VR <br />Page 41 of 158 <br />Editor's note— Ord. No. 2498 , § 3(Exh. A), adopted Sept. 27, 2021, amended Art. 29 in its entirety to read as herein set out. <br />Former Art. 29, §§ 29.1—29.11, pertained to similar subject matter, and derived from Ord. No. 1130-375, § 4, adopted June <br />25, 2918). <br /> <br />[Only changes are to 29.5] <br />29.5 - Payment of a Housing Impact Fee. <br />[Subsections 29.5(A) and (B) remain unchanged. Only changes are to Subsection 29.5(C).] <br />C. Exemptions. The housing impact fee shall not apply to developers of residential or <br />nonresidential development projects, which fall within one (1) or more of the following <br />categories: <br />1. Four (4) or Fewer Dwellings. The housing impact fee shall not apply to developers of <br />residential development projects consisting of four (4) or fewer dwelling units; the <br />creation of four (4) or fewer parcels, provided that no more than four (4) dwelling <br />units are allowed; or accessory dwellings created under Article 37 of the Redwood <br />City Zoning Code. <br />2. Twenty (20) or More Dwellings. Residential development projects of twenty (20) <br />units or more (excluding accessory dwelling units) that are required to construct <br />affordable units on site per Section 29.4 (Requirements for Inclusion of Affordable <br />Housing) of this Article. <br />3. Nonresidential Development of Five Thousand (5,000) Square Feet or Less. The <br />housing impact fee shall not apply to developers of nonresidential development <br />projects adding five thousand (5,000) square feet or less of net new square footage. <br />4. Government-Owned. Residential or nonresidential development projects located on <br />property owned by the state of California, the United States of America, or any of its <br />agencies and used exclusively for governmental or educational purposes. <br />5. Damaged or Destroyed. Any development project proposed to repair or replace a <br />structure that was damaged or destroyed by fire or other calamity, so long as the <br />square footage and permitted use of the structure remains the same, and the <br />planning application for the project is filed within one (1) year of the damage's <br />occurrence. If and to the extent there is a change in the permitted use or an increase <br />in the square footage of the structure, then the housing impact fee shall be <br />calculated based on the net new square footage of the structure at the rate <br />applicable to the type of permitted use (residential or nonresidential). <br />6. Demolished Structures. Any development project proposed to replace a structure <br />previously located on site but which has been demolished, so long as the square <br />footage and permitted use of the structure remains the same, and the planning <br />application for the project is filed within two (2) years of the demolition of the <br />structure being replaced. If and to the extent there is a change in the permitted use
The URL can be used to link to this page
Your browser does not support the video tag.