Laserfiche WebLink
<br /> <br />ATTY/RESO.0025/PC RESO ADOPT AMENDMENTS TO THE ZONING CODE – 2023-2031 HOUSING ELEMENT – EXHIBIT A <br />REV: 06-20-24 VR <br />Page 80 of 158 <br />Maximum Building <br />Length <br />200 200 200 200 300 Section <br />53.5.B.7 <br />Space between <br />buildings on the same <br />lot <br />30 15 3015 20 15 3015 30 15 - <br />Notes: (1) Primary street shall mean the street after which a sub-district is named. A secondary <br />street shall mean any other street. <br /> <br /> <br />2. Supplemental Development Standards for the MUC-RC Sub-District. <br />a. Creekside Setbacks. Minimum building setback from the Redwood Creek Trail shall be <br /> twenty-five (25) feet, or approximately thirty-nine (39) feet from creek top-of-bank. <br />b. Creek Stormwater Protection. New development adjacent to Redwood Creek shall <br /> provide protection for creeks and riparian vegetation and integrate stormwater best <br /> management measures to minimize water quality and erosion impacts to the creek <br /> environment. <br /> <br />53.7 - Height, Density, and Intensity Regulations. <br />[Subsections 53.7(A) 2 and 3 remain unchanged. Only changes are to Subsection 53.7(A)(1).] <br />A. Height, Density, and Intensity Regulations by Sub-District. <br />1. General Development Standards by Sub-District.