My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso24 16254
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2020-2029
>
2024
>
Reso24 16254
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/29/2024 2:33:22 PM
Creation date
10/29/2024 2:29:31 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Date
10/28/2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
141
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
(CBG, pp. 4-5) See more detail below in item X, Hydrology and Water Quality. The <br />project would be served by existing City water mains within Woodside Road. (CBG, pp. <br />2-3) <br />The project proposes to install one new fire hydrant near the northern part of the site along <br />Woodside Road, which, in addition to the existing fire hydrant along Woodside Road on <br />the south side of the proposed garage entry, would provide a total of two fire hydrants (Plan <br />Sheet C.5, 10/30/23). <br />The project would be 100 percent electric. (Plan Sheet PA0.1, 10/27/23) The project would <br />include a variety of energy-efficient features, including: solar panels on the roof; naturally <br />ventilated garage area rather than mechanical ventilation; use of high-efficiency, insulated, <br />low-e (“low emissivity”) exterior glazing to reduce mechanical cooling loads; building <br />massing oriented to take advantage of solar access while prioritizing unit shading, <br />increasing resident comfort, and decreasing reliance on cooling systems; energy efficient <br />building envelope and wall and roof assemblies; heat recovery ventilator (HRV) for the <br />community room HVAC system to reduce heating/cooling energy usage; occupancy <br />sensors in high-occupancy rooms to reduce ventilation air during unoccupied periods; <br />landscaping designed to be drought-tolerant and watered using a high-efficiency irrigation <br />system with remotely monitored weather-based controllers; exterior (outdoor) unit entry <br />walkways, thereby reducing the need for interior ventilation systems or air conditioning; <br />Energy Star appliances; operable windows in units for natural ventilation and light; and <br />LED lighting. (FORA Architects, “Energy Efficiency Measures Memo, 847 Woodside <br />Road,” undated) <br />The project anticipates a construction period of approximately 26 months. Impacts related <br />to construction are discussed in relevant sections of this document. <br />Resident access would be provided primarily through the main entry doors to the lobby on <br />Woodside Road, with gated entry to the courtyard at the end of a short corridor adjacent to <br />the lobby. (C.3 10/30/23; PA3.1 10/27/23). <br />Refuse and recycling would be in an enclosed trash room within the building off the <br />building driveway on Woodside Road near the southern end of the building; property <br />management staff would wheel the bins for pick-up by waste service trucks at the main <br />entrance loading zone on Woodside Road (Plan Sheet PA5.6, 10/27/23). Electrical, <br />generator, plumbing, fire pump, and maintenance rooms would be accessible at street level <br />(Plan Sheets PA3.1 and PA3.2, 10/27/23; Plan Sheet C.3, 10/30/23). <br />There are 14 existing redwood trees on the property. Three of the trees would be impacted <br />by the proposed building and need to be removed, and the remaining 11 trees would be <br />retained by the project. (Plan Sheets PL2.0, PL2.1, and PL2.2) Trees currently on the site <br />vary in height between approximately 30 and 75 feet tall. The project would plant 1 new <br />Yoshino Japanese Cedar and 3 new Osakazuki Japanese Maples trees on the ground floor <br />courtyard. It would plant 9 Osakazuki Japanese maples and 4 Japanese Stewartia trees on <br />the 2nd floor podium level. The project would plant 7 new Rocky Mountain Maple trees <br />would be added at grade level as street trees (Plan Sheets PL3.0, 3.1, and 3.3, 2/2/24). <br /> <br />Previous CEQA Analysis and Purpose of CEQA Guidelines § 15183 Consistency <br />Checklist <br />1900 Broadway Component: Previous CEQA Analysis and Purpose of CEQA Guidelines <br />§15183 Consistency Checklist: <br />On January 24, 2011, a program environmental impact report (EIR) was certified by the <br />City Council of Redwood City (Final Environmental Impact Report for the Redwood City <br />Downtown Precise Plan, State Clearinghouse #2006052027), pursuant to the California <br />ATTY/RESO.0070/CC RESO 1900 BROADWAY (CEQA) - EXHIBIT 1 - CEQA CONSISTENCY CHECK LIST <br />REV: 10-23-24 VR <br /> <br />Page 9 of 135
The URL can be used to link to this page
Your browser does not support the video tag.