Laserfiche WebLink
<br />103 <br /> Compliance with conditions of approval and the existing State and local regulatory framework would ensure the <br />groundborne vibration impacts of the project component will be less than significant, and no additional mitigation <br />would be required. The Focused GPU program EIR evaluated construction and operational noise under similar <br />distances and conditions presented by the 847 Woodside Road project component. For the reasons discussed here, <br />the 847 Woodside Road project component would not create new impacts or increase impacts, and there is no new <br />information of substantial importance for CEQA purposes. <br />c. The project component site is located (on the fly) more than two miles of San Carlos Airport. According to the <br />Focused GPU program EIR (p. 4.13-44), the Focused GPU area “…is not located in any noise contour zone associated <br />with this airport [San Carlos Airport] and would not expose people residing or working in the Planning Area [Focused <br />GPU area] to excessive airport-related noise levels.” Because the project component site is outside the projected 55dB <br />CNEL contour shown in the Redwood City General Plan (Figure PS-9: San Carlos Airport Noise Contours, June 2002) <br />and the San Mateo County Comprehensive Airport Land Use Plan (Exhibit 4-2: Future Conditions [2035] Aircraft <br />Noise Contours), no significant impacts related to airport operations have been identified related to the project <br />component and no noise mitigation would be required. Therefore, the project component would not result in new or <br />more severe impacts with respect to airport noise than those identified in the Focused GPU EIR, and there is no new <br />information of substantial importance for CEQA purposes. This impact would be less than significant. <br />CONCLUSION: <br /> With regards to the issue area of Noise and Vibration, the following findings can be made: (1) no peculiar impacts to <br />the 847 Woodside project component or its site have been identified, (2) there are no potentially significant effect or <br />off-site and/or cumulative impacts which were not discussed by the Focused GPU EIR, (3) no substantial new <br />information has been identified which results in an impact which is more severe than anticipated by the Focused GPU <br />EIR, and (4) the mitigation measure (Mitigation Measure Noise-1, pertaining to railroad tracks) contained within the <br />Focused GPU EIR is not applicable to the project component and therefore would not be required of the project <br />component. Project component noise impacts would be less than significant. For these reasons, the noise and vibration <br />impacts of the proposed project component would be consistent with the impacts identified in the Focused GPU EIR <br />and this project component does not require additional environmental review under CEQA Guidelines section 15183. <br /> <br />ATTY/RESO.0074/CC RESO 847 WOODSIDE (CEQA) - EXHIBIT 1 - CEQA CONSISTENCY CHECKLIST <br />REV: 10-23-24 VR <br /> <br />Page 103 of 135