Laserfiche WebLink
<br />46 <br />them less than significant. For these reasons, the biological resources impacts of the proposed project component <br />would be consistent with the impacts identified in the EIR/SEIR and this project component does not require additional <br />environmental review under CEQA Guidelines section 15183. <br /> <br />847 Woodside Road Component: <br />a. The Focused GPU program EIR (p. 4.4-37) concluded that special-status species would be potentially affected only <br />by Focused GPU-facilitated development that occurred in sensitive biological resource areas, such as adjacent to <br />natural habitat, including areas along riparian corridors and streams, Bayland areas, grassland, forest, and woodland. <br />The impacts were found to be less than significant with mitigation. The Focused GPU program EIR (p. 4.4-32) <br />identified most of the sites proposed for housing development to be in existing developed areas where no habitat for <br />special-status species exists, except where the development is adjacent to Redwood Creek. <br />The project component site is located about 3,800 feet south of El Camino Real and on Woodside Road, which is an <br />area with existing and neighboring development. Because the project component is not occurring in a sensitive <br />biological resource area as identified above and does not provide suitable habitat for special status plants or wildlife <br />species, it would not result in impacts on special-status species, and Focused GPU program EIR Mitigation Measures <br />BIO-1 and BIO-2 are not required. The type of construction and operational impacts associated with the 847 Woodside <br />project component would be similar to those analyzed in the Focused GPU EIR and the laws, standard policies, and <br />conditions of approval applicable to development would ensure best practices for protecting sensitive species are <br />followed. <br />The Focused GPU program EIR (pp. 4.4-32 and 4.4-33) did conclude that impacts from removal of trees and structures <br />could result in significant impacts on burrowing owls, nesting birds, and roosting bats. The Focused GPU EIR (pp. <br />4.4-38 and 4.4-29) includes Mitigation Measures BIO-5, BIO-7, and BIO-9 to reduce these impacts to a less-than- <br />significant level. These mitigation measures, which shall be required as a condition of approval for the project <br />component, would reduce the potential impacts of the project component on identified candidate, sensitive, or special <br />status species to a less-than-significant level. Therefore, the 847 Woodside project component would be less than <br />significant with mitigation. This project component is consistent with the analysis in the Focused GPU EIR because <br />it would not create new impacts or increase impacts and there is no new information of substantial importance for <br />CEQA purposes. <br />b. According to the Focused GPU program EIR (p. 4.4-40), riparian habitat is present along portions of Redwood Creek, <br />Cordilleras Creek, and their tributaries. The impacts were found to be less than significant with mitigation. <br />The project component site is located over 1-1/2 miles south of Redwood Creek. (Cordilleras Creek is located another <br />approximately 4,000 feet generally northwest of Redwood Creek.) There are no riparian habitats or sensitive natural <br />communities identified in the vicinity of the project component (Focused GPU program EIR pp. 4.4-6 and 4.4-8). The <br />type of construction and operational impacts associated with the 847 Woodside project component would be similar <br />to those analyzed in the Focused GPU EIR and the laws, standard policies, and conditions of approval applicable to <br />development would ensure best practices for protecting habitats are followed. For this reason, the proposed project <br />component is expected to have no effect on any riparian habitat or other sensitive natural community identified in <br />local or regional plans, policies, or regulations, or by the California Department of Fish and Wildlife or U.S. Fish and <br />Wildlife Service. Therefore, the 847 Woodside project component would have no impact. This project component is <br />consistent with the analysis in the Focused GPU EIR because it would not create new impacts or increase impacts and <br />there is no new information of substantial importance for CEQA purposes. <br />c. The Focused GPU program EIR (Focused GPU program EIR p. 4.4-44) concluded that the potential for loss or <br />disturbance of jurisdictional wetlands or regulated waters existed only with development that is in Bayland areas, <br />especially immediately north and south of U.S. 101; in areas west of Steinberger Slough; and in areas along streams <br />such as Redwood Creek. In addition, there are some undeveloped areas in the western part of the Focused GPU <br />planning area that could support protected wetlands. The impacts were reduced to less than significant with mitigation. <br />Because the project component site is located in an existing developed area south of El Camino Real and generally in <br />the southeastern part of the Focused GPU planning area, and because the site is located over 1-1/2 miles south of <br />Redwood Creek, no impact is anticipated. The type of construction and operational impacts associated with the 847 <br />Woodside project component would be similar to those analyzed in the Focused GPU EIR and the laws, standard <br />policies, and conditions of approval applicable to development would ensure best practices for protecting wetlands <br />and regulated waters are followed. For this reason, the proposed project component is expected to have no effect on <br />any wetlands or regulated waters. Therefore, the 847 Woodside project component would have no impact. This project <br />component is consistent with the analysis in the Focused GPU EIR because it would not create new impacts or increase <br />impacts and there is no new information of substantial importance for CEQA purposes. <br />ATTY/RESO.0074/CC RESO 847 WOODSIDE (CEQA) - EXHIBIT 1 - CEQA CONSISTENCY CHECKLIST <br />REV: 10-23-24 VR <br /> <br />Page 46 of 135