Laserfiche WebLink
Docktown Marina Project Custom Report, 11/6/2024 <br />13 / 14 <br />Phase Name Residential Interior Area <br />Coated (sq ft) <br />Residential Exterior Area <br />Coated (sq ft) <br />Non-Residential Interior Area <br />Coated (sq ft) <br />Non-Residential Exterior Area <br />Coated (sq ft) <br />Parking Area Coated (sq ft) <br />5.6. Dust Mitigation <br />5.6.1. Construction Earthmoving Activities <br />Phase Name Material Imported (cy)Material Exported (cy)Acres Graded (acres)Material Demolished (Ton of <br />Debris) <br />Acres Paved (acres) <br />Demolition 0.00 0.00 0.00 420 — <br />5.6.2. Construction Earthmoving Control Strategies <br />Control Strategies Applied Frequency (per day)PM10 Reduction PM2.5 Reduction <br />Water Exposed Area 2 61%61% <br />Water Demolished Area 2 36%36% <br />5.7. Construction Paving <br />Land Use Area Paved (acres)% Asphalt <br />Other Non-Asphalt Surfaces 0.05 0% <br />5.8. Construction Electricity Consumption and Emissions Factors <br />kWh per Year and Emission Factor (lb/MWh) <br />Year kWh per Year CO2 CH4 N2O <br />2024 0.00 204 0.03 < 0.005 <br />2025 0.00 204 0.03 < 0.005 <br />5.18. Vegetation <br />6.G. - Page 44 of 45 <br />222