My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc2025-003096 Lane 1900 Broadway Owner LLC
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Development Agreements
>
RecDoc2025-003096 Lane 1900 Broadway Owner LLC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/13/2025 4:01:36 PM
Creation date
1/23/2025 3:17:46 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Subject
Development Agreement
Doc Num
2025-003096
Rec Date
1/23/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
253
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 8.7 Amendments to Project Approvals. Project Approvals (not including <br />amendments to this Agreement, as set forth above in Sections 83 through 8.5) may be amended <br />or modified from time to time, subject to the written request of Developer or with the written <br />consent of Developer at its sole discretion. Except as otherwise provided for herein, City shall not <br />request, process, or consent to any amendment to the Project Approvals that would affect the <br />Property or the Project without Developer's prior written consent. Amendments to the Project <br />Approvals shall be governed by the Project Approvals and by the Applicable City Regulations. <br />Once approved by City, all amendments shall automatically become part of the Project Approvals, <br />as described in Recital L of this Agreement. <br />Section 8.8 Amendments and CEQA/Mitigation Measures. The City has prepared and <br />certified the DTPP SEIR and the Consistency Checklist, which evaluates the environmental effects <br />of full development, operation, and use of the Project, and has imposed all feasible mitigation <br />measures, including the requirement to design and construct certain improvements or pay the fair <br />share contributions set forth in Section 5.3 above, to reduce the significant environmental effects <br />of the Project. The Parties understand that the DTPP SEIR and the Consistency Checklist are <br />intended to be used not only in connection with the Project Approvals, but also, to the extent legally <br />permitted, in connection with amendments to the Project Approvals. However, the Parties <br />acknowledge that certain amendments may legally require additional analysis under CEQA. For <br />example, a change in the Project Approvals could require additional analysis under CEQA if the <br />triggering conditions identified in CEQA Guidelines Section 15162 are met. In the event <br />supplemental or additional CEQA review is required for an amendment, City shall conduct such <br />supplemental or additional CEQA review to the scope of analysis mandated by CEQA in light of <br />the scope of City's discretion to be exercised in connection with the amendments. Developer <br />acknowledges that, if the City determines based upon supplemental or additional CEQA review <br />that the amendments to the Project Approvals will result in new significant effects or substantially <br />increase the severity of effects that were identified in the DTPP SEIR and the Consistency <br />Checklist, City may require additional feasible mitigation measures necessary to mitigate such <br />impacts, provided however (except as otherwise expressly provided herein) such additional <br />mitigation measures shall not prevent development of the Project for the uses set forth in the <br />Project Approvals. Developer shall comply with the mitigation measures in the DTPP Plan -Wide <br />Amendments MMRP, which reflect the mutually agreed-upon timing of specified improvements <br />and Developer's pro rata share of funding, where applicable. In the event further mitigation <br />measures are identified by such additional environmental review, City may require, and Developer <br />shall comply with, all feasible mitigation measures necessary to substantially lessen new or <br />substantially more severe significant environmental impacts of the Project Approvals, which were <br />not foreseen at the time of execution of this Agreement. <br />ARTICLE 9. SUBSEQUENT APPROVALS AND IMPLEMENTATION <br />Section 9.1 Subsequent Approvals. Certain subsequent land use approvals, <br />entitlements, agreements and permits other than the Project Approvals, will be necessary or <br />desirable for implementation of the Project ("Subsequent Approvals"). The Subsequent <br />Approvals may include, without limitation, the following: amendments to the Project Approvals, <br />approval of the Purchase Agreement, vacation and abandonment of the Spring Street Segment and <br />30 <br />ATTY/AGR/2024.193 - GATEKEEPER DA -1900 BROADWAY <br />REV: 10-22-24 VR <br />
The URL can be used to link to this page
Your browser does not support the video tag.