My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
RecDoc2025-00642 STMMA 557 E. Bayshore Road
RedwoodCity
>
City Clerk
>
Recorded Docs CC&Rs
>
Recorded Docs 2013-2020 Additional sub folders
>
Recorded Documents 2013-2023 (additional sub folders)
>
Stormwater Treatment Measure Agreements
>
RecDoc2025-00642 STMMA 557 E. Bayshore Road
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2025 12:39:51 PM
Creation date
2/6/2025 12:39:10 PM
Metadata
Fields
Template:
Recorded Docs
Recorded Docs - Type
Agreement
Doc Num
2025-000642
Rec Date
1/7/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Flow -Through Planter Maintenance Plan for <br />557 E Bayshore Road <br />April 2024 <br />Flow-through planters are designed to treat and <br />temporarily detain runoff without allowing seepage <br />into the underlying soil They typically receive runoff <br />vio downspouts leading.from the roofs of adjacent <br />buildings. <br />Project Address and Cross Streets <br />557 E Bayshore Road, Redwood City, CA 94063 <br />Whipple & B Bayshore Road <br />Assessor's Parcel No. 052-520-160, -330 <br />Property Owner: Redwood Crossing, LLC. <br />Phone No.: 415.448.8330 <br />Designated Contact: Glen Ceridono <br />Phone No.:415.448.8330 <br />Mailing Address: 750 Pelican Way, San Rafael, CA 94901 <br />The property contains 21 flow-through planter(s), located as described below and as shown in the attached <br />site plan: <br />■ See Stormwater Management Plan C9.0 included in project drawings and Storm Drain Report. <br />i, Routine Maintenance Activities <br />The principal maintenance objectives are to ensure that water flows unimpeded into the flow- <br />through planter and landscaping remains attractive in appearance. Table 1 shows the routine <br />maintenance activities, and the frequency at which they will be conducted. <br />Table 1 <br />Routine Maintenance Activities for Flow -Through Planters <br />No. <br />Maintenance Task <br />Frequency of Task <br />1 <br />Evaluate health of trees and groundcover. Remove and replace all dead and <br />Twice a year <br />diseased vegetation. <br />2 <br />Maintain vegetation and the irrigation system. Prune and weed to keep flow- <br />As needed <br />through planter neat and orderly in appearance. <br />3 <br />Check that mulch is 3" deep and replenish as necessary. It is recommended that <br />As needed <br />composted arbor mulch be applied once per yearto maintain the 3" depth in all <br />bare soil areas except within six inches of tree trunks. <br />Page 1 <br />ATTY/AGR.2024.174/Redwood Crossing LLC (557 E Bayshore STMMA) (Page 20 of 26) <br />Updated 1/1/20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.