My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agda Pkt 2025.02.08 Special Meeting
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2025
>
Agda Pkt 2025.02.08 Special Meeting
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2025 4:54:44 PM
Creation date
2/10/2025 4:53:54 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Special
Agency Type
City Council
Date
2/8/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
148
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />Completed On Track Delayed <br /> <br />GUIDING PRINCIPLES AND GOALS – FY 2024-25 Mid-Year Progress Page | 29 <br /> <br />Goals Department Quantifiable Measure of <br />Progress <br />(0%, 25%, 50%, 75%, 100%) <br />Update <br />If delayed, include detail as to cause <br />Multi-Year Goal: Implement the Sea <br />Level Rise Vulnerability Assessment <br />findings including: <br /> <br /> <br />1.) Issuing an RFP for planning, site <br />investigation, permitting and <br />initial designs and develop an <br />MOU for the levees project with <br />One Shoreline and benefitting <br />agencies (e.g., San Mateo County, <br />San Carlos, and Belmont). <br />ET 25% <br />Draft RFP for planning, site investigation, <br />permitting and initial designs was distributed <br />to stakeholder agencies in early December <br />2024 and staff have received feedback to be <br />incorporated in the final version. RFP plan to <br />be released by February 2025. MOU will be <br />developed once a consultant is selected and <br />the anticipated cost are known. <br />2.) Implementing two FEMA grant- <br />funded projects to enhance <br />pumping capacity and resilience <br />for future events to handle <br />stormwater flows expected <br />during a 100-year storm event <br />within their respective <br />watersheds by 2027. Moving <br />Bradford Pump Station Project <br />into the construction phase, <br />which will take two years, <br />depending on the authorization <br />of the Grant Administrator. <br />ET 25% <br /> <br /> <br /> <br /> <br />The turnover of grant administrators and the <br />new regulation (requiring raising of the <br />finished floor elevation) has kept us from <br />moving to authorization of phase-II funding. <br />5.A. - Page 66 of 75 <br />68
The URL can be used to link to this page
Your browser does not support the video tag.