My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt25 H2O Solutions, L.L.C.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2025
>
Under $108K
>
Agmt25 H2O Solutions, L.L.C.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/29/2025 11:11:02 AM
Creation date
3/5/2025 4:44:39 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
water storage tank inspections and cleaning services
RMP File Number
304.5
Date
2/13/2025
Amendment
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REV: 01-09-25 MI <br />Tank/Reservoir <br />Fiscal Year <br />to be <br />Cleaned <br />(840 California Way) <br />•All tanks are accessible by truck and 20’ trailer and have external ladders. <br />•Entry hatches are greater than 24”. <br />•Water can be discharged on-site with proper dechlorination and sediment control <br />measures. <br />A. Tank Evaluation <br />Contractor shall perform a comprehensive interior and exterior inspection of the tanks. <br />The Contractor shall provide high quality video of all internal surfaces above and <br />below waterline, including the roof, and outside the tank. The video shall be narrated <br />on site. The Contractor shall also provide high quality digital photographs of inside <br />and outside the tank. All equipment and divers shall be properly disinfected prior to <br />each dive. <br />Contractor shall notify the City immediately (same day) if any structural defects are <br />observed on the exterior or interior of the tank, or if the inspection and cleaning cannot <br />be performed for any reason. <br />The following items shall be inspected on each tank: <br />•Condition of steel on the interior and exterior (as applicable). <br />•Condition of concrete walls (as applicable). <br />•Corrosion of any exposed materials. <br />•Conditions of tank hatches, vents and other penetrations, as well as screens, <br />overflow systems and covers. <br />•Measurement of bottom sediment depths in a minimum of four (4) locations. <br />Sediment shall then be averaged out over the surface of the tank. <br />•Percentage of coating failure and corrosion on all coated surfaces. <br />•Condition of foundation and anchors (as applicable). <br />•Condition of any interior and exterior ladders and fall protection systems. <br />•Cathodic protection review of all components (as applicable). <br />•Pit and blister analysis. The extent of pitting shall be described by the <br />location and character. <br />•Examine wall-floor joints for leakage and signs of concrete deterioration. <br />•Examine roof. <br />•Examine all seams and floors. <br />•Inspect support columns and column to roof area. <br />ATTY/AGR.2025.003/H2O Solutions, L.L.C. (Water Storage Tank Inspections and Cleaning) REV: 01-09-25 MI (Page 12 of 19)
The URL can be used to link to this page
Your browser does not support the video tag.