My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agda Pkt 2025.03.10 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2025
>
Agda Pkt 2025.03.10 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2025 2:48:55 PM
Creation date
3/11/2025 2:44:20 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
3/10/2025
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
3/11/2025 2:48 PM
Modified:
3/11/2025 2:48 PM
Text:
http://www.redwoodcity.org/
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
715
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Page 1 of 5 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.org <br />STAFF REPORT <br />To the Honorable Mayor and City Council <br />From the City Manager <br />DATE: March 10, 2025 <br />SUBJECT <br />Final acceptance of two sanitary sewer emergency repair projects: the Emergency Veterans Boulevard <br />Sanitary Sewer Repairs and Replacement Project (Phase 2 of 3) and supplemental 2024 Emergency <br />Veterans Boulevard Sewer Replacement Project <br />RECOMMENDATION <br />1. By motion, accept the Emergency Veterans Boulevard Sanitary Sewer Repairs and Replacement <br />Project (Phase 2) and authorize the release of bonds and retention according to City procedures; <br />2. By motion, accept the supplemental 2024 Emergency Veterans Boulevard Sewer Replacement Project <br />and authorize the release of bonds and retention according to City procedures; and <br />3.By motion, approve the City Manager’s emergency action and determine that the supplemental 2024 <br />Emergency Veterans Boulevard Sewer Replacement Project was necessary to respond to the <br />emergency, and retroactively authorize the City Manager’s execution of the construction contract <br />with SubTerra Construction, Inc. for $685,676. <br />STRATEGIC PLAN GUIDING PRINCIPLE <br />Public Safety <br />BACKGROUND <br />The City currently owns and operates two parallel sanitary sewer interceptor lines on Veterans Boulevard, <br />measuring 30-inches in the north line and 33-inches in the south line, that collect a majority of the flow <br />from the Fair Oaks Sewer Maintenance District of San Mateo County. In 2016, a Closed-Circuit Television <br />(CCTV) condition assessment was performed on the two large-diameter lines, as part of the City’s CIP <br />annual condition assessment program. The two lines were found to be in fair condition. <br />6.B. - Page 1 of 5 <br />62
The URL can be used to link to this page
Your browser does not support the video tag.