My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
2025.04.14 Speaker Card - PC
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2025
>
Speaker Cards - Public Comments
>
2025.04.14 Speaker Card - PC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 11:41:45 AM
Creation date
4/15/2025 1:37:48 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Speaker Card
Meeting Type
Joint
Agency Type
City Council
Date
4/14/2025
Jump to thumbnail
< previous set
next set >
Text box
ID:
1
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
4/15/2025 1:38 PM
Modified:
4/15/2025 1:38 PM
Text:
mailto:elmogrot@astound.net
ID:
2
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
4/15/2025 1:38 PM
Modified:
4/15/2025 1:38 PM
Text:
mailto:council@redwoodcity.org
ID:
3
Creator:
REDWOOD_CITY\NANCYRAMIREZ
Created:
4/15/2025 1:38 PM
Modified:
4/15/2025 1:38 PM
Text:
https://aka.ms/LearnAboutSenderIdentification
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
277
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
From:John Kirk (elmogrot@astound.net) Sent You a Personal Message <br />To:GRP-City Council <br />Subject:Redwood Life Community Alternative Needs More Work <br />Date:Thursday, March 27, 2025 4:41:06 PM <br />[You don't often get email from kwautomail@phone2action.com. Learn why this is important at <br />https://aka.ms/LearnAboutSenderIdentification ] <br />Dear Redwood City Council, <br />I?m concerned that this proposed development is not in the interest of the people of Redwood City for a number of <br />reasons. <br />1. The increasing pace of global warming is guaranteed to cause a rise in the level of the bay. Unless the developer <br />puts up the money to raise the required levies, those costs will be placed on the shoulders of the taxpayers of <br />Redwood City. <br />2. The land on which the development is planned would be better utilized an addition to the existing marshland. <br />3. Large buildings built on land fill are sure to cause liquefaction during a major earthquake resulting in the <br />buildings sinking into the mud. <br />4. Almost all developers make more promises than they actually keep leaving some hidden long run costs for the <br />city to pay. <br />Dear Redwood City Council Members, <br />I am writing to express concerns about the inadequacy of Alternative 2 put forward by the developer. While it <br />includes good steps to reduce the project impact on neighbors, it falls short of addressing key community concerns <br />and does not fulfill the promise of a truly community-developed alternative. Even the project proponents have <br />acknowledged ongoing environmental concerns, including risks tied to building on the landfill, sea level rise, and <br />groundwater issues. <br />I urge you to postpone the vote and finish the final step with the community to develop an alternative that more <br />effectively addresses environmental, safety, and community concerns. We are close to finalizing a solution that <br />meets both community needs and the economic goals of the City, but feedback from the February 12th workshop is <br />not reflected in Alternative 2. The community deserves to see their concerns addressed before moving forward to <br />CEQA review. <br />1. Overstated Reductions in Alternative 2 <br />At the March 3rd Study Session, the developer claimed a 20 percent reduction in project size, but the actual <br />reduction is only 13.77 percent, from 3,316,970 sf to 2,860,000 sf. This minimal reduction does not adequately <br />address concerns about the project scale. For comparison, the Ravenswood Business District in East Palo Alto <br />reduced its proposal by 25 percent after community feedback. <br />2. Environmental Concerns Remain Unaddressed <br />The Sensitivity Analysis prepared for the City highlighted environmental risks, but Alternative 2 does not fully <br />address them. <br />* Sea Level Rise. The plan fails to meet Regional Shoreline Adaptation Plan requirements for nature based <br />adaptation and does not adequately address groundwater rise or flooding. The vague commitment from developers <br />to fund levee improvements is insufficient. <br />* Landfill. The site, located on a former landfill adjacent to the Redwood Shores Ecological Reserve, presents <br />substantial risks. The proposed construction would pierce the protective clay cap over 1,000 times, potentially <br />releasing contaminants into surrounding ecosystems. The area already shows signs of deterioration with voids and <br />settlement under the cap, compounded by rising groundwater levels. Additionally, the proposed buildings, as much <br />as 120 feet tall, would place unprecedented weight on unstable soil, increasing risks of seismic activity, liquefaction,
The URL can be used to link to this page
Your browser does not support the video tag.