Laserfiche WebLink
<br /> <br />13 <br /> <br />be experienced before any mitigation measures are implemented. A discussion of shortage response actions is <br />in Section 7 of this WSA and is also detailed in the City’s WSCP, included in Chapter 8 of the City’s 2020 UWMP. <br /> <br />Table 4-3 presents the projected future single and multiple dry year water demand, as presented in the City’s <br />2020 UWMP prior to implementation of the WSCP and its associated demand reduction measures. <br /> <br />Table 4-3. Redwood City Projected Future Water Demand – Dry Years (AFY) <br />Hydrologic Condition <br />Assumed <br />Demand <br />Reduction (b) <br />Projected Water Demand(a) <br />2025 2030 2035 2040 2045 <br />Single Dry Year(c) 0% 10,806 11,049 11,566 11,696 11,923 <br />Multiple Dry Years(d,e) 0% 10,806 11,049 11,566 11,696 11,923 <br />(a) Demand projection includes both potable water and recycled water (reference Table 4-2 of this WSA). <br />(b) Conservatively assumes no demand reduction in dry years, as compared to normal years. Demands may be reduced in dry years <br />as a result of the City’s implementation of its Water Shortage Contingency Plan; however, such a demand reduction is not assumed <br />or relied upon for the purposes of the Single Dry Year and Multiple Dry Year evaluations for this WSA. <br />(c) Source: Redwood City 2020 UWMP, Table 7-5. <br />(d) Source: Redwood City 2020 UWMP, Table 7-6. <br />(e) Represents demands for each year of the 5-year multiple dry year period. <br /> <br /> <br />5.0 Redwood City Water Supplies <br />10910(c)(2) If the projected water demand associated with the proposed project was accounted for in the <br />most recently adopted urban water management plan, the public water system may incorporate the <br />requested information from the urban water management plan in preparing the elements of the <br />assessment required to comply with subdivisions (d), (e), (f) and (g). <br /> <br />10910(d)(1) The assessment required by this section shall include an identification of any existing water <br />supply entitlements, water rights, or water service contracts relevant to the identified water supply for the <br />proposed project, and a description of the quantities of water received in prior years by the public water <br />system…under the existing water supply entitlements, water rights, or water service contracts. <br /> <br />10910(e) If no water has been received in prior years by the public water system…under the existing water <br />supply entitlements, water rights, or water service contracts, the public water system…shall also include in <br />its water supply assessment…an identification of the other public water systems or water service contract <br />holders that receive a water supply or have existing water supply entitlements, water rights, or water <br />service contracts, to the same source of water as the public water system. <br /> <br />10910(f) If a water supply for a proposed project includes groundwater, the following additional <br />information shall be included in the water supply assessment. <br /> <br />(1) A review of any information contained in the urban water management plan relevant to the identified <br />water supply for the proposed project. <br />ATTY/RESO.0027/CC RESO WATER SUPPLY ASSESSMENT (920 SHASTA) - EXHIBIT A <br />REV: 04-22-25 VR <br /> <br />Page 13 of 42