Laserfiche WebLink
<br /> <br />26 <br /> <br />The Project was included in the 2020 UWMP, but the scope of the project increased since the UWMP was <br />completed. This additional scope has increased potable water demand by 21.2 afy and recycled water demand <br />by 45.0 afy for a total additional demand of 66.2 afy. Table 7-2 summarizes the water demand versus supply <br />with the full implementation of the Bay-Delta Plan including additional demands for the Project which was not <br />included in the UWMP. Table 7-4 below similarly summarizes the water demand versus supply but without the <br />full implementation of the Bay-Delta Plan and additional Project demands. <br /> <br />It should be noted that that due to the additional demands for the project included in Table 7-2 the percent <br />shortfall does not change from Table 7-1 meaning the shortage response as outlined in the UWMP would not <br />change. This conclusion also holds true when comparing the additional demands for the project shown in Table <br />7-4 with what the UWMP included shown in Table 7-3. <br /> <br />ATTY/RESO.0027/CC RESO WATER SUPPLY ASSESSMENT (920 SHASTA) - EXHIBIT A <br />REV: 04-22-25 VR <br /> <br />Page 26 of 42