My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso25 16295
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2020-2029
>
2025
>
Reso25 16295
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 3:54:43 PM
Creation date
4/29/2025 3:53:44 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Agency Type
City Council
Date
4/28/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />128 <br /> <br />Prior EIR Determination Effect <br />Peculiar to <br />Project <br />Site? <br />New <br />Significant <br />Effect? <br />New Significant <br />Off-Site, <br />Cumulative <br />Impact? <br />New Information, <br />More Severe <br />Adverse Impact? DTPP EIR <br />DTPP Plan-Wide <br />Amendments <br />SEIR <br />Focused <br />GPU <br />EIR <br />XVII. TRANSPORTATION – Would the project: <br />a) Conflict with a program, plan, ordinance <br />or policy addressing the circulation <br />system, including transit, roadway, <br />bicycle and pedestrian facilities? <br />SU LTS LTS No No No No <br />b) Conflict or be inconsistent with CEQA <br />Guidelines § 15064.3, subdivision (b) <br />(i.e., VMT impact assessment consistent <br />with the City’s TAM)? <br />Not <br />Addressed LTS SU No No No No <br />c) Substantially increase hazards due to a <br />geometric design feature (e.g., sharp <br />curves or dangerous intersections) or <br />incompatible uses (e.g., farm <br />equipment)? <br />LTS LTS LTS No No No No <br />d) Result in inadequate emergency access? LTS LTS LTS No No No No <br /> <br />Documentation: <br /> <br />Commercial Component: <br />a. The DTPP program EIR (pp. 9-48 through 9-79) identified significant and unavoidable impacts at 17 area <br />intersections, as well as impacts on freeway segments, freeway ramps, and transit service. The DTPP Plan-Wide <br />Amendments program SEIR (pp. 9-20 through 9-24) acknowledged the DTPP EIR conclusion but explained that since <br />certification of the DTPP program EIR, several CEQA criteria have been revised and, as discussed in item (b) below, <br />the use of vehicle LOS or other delay- or congestion-based metrics for transportation and circulation impact analysis <br />has been discontinued. Therefore, the DTPP Plan-Wide Amendments program SEIR determined that the related <br />DTPP EIR transportation mitigation measures would not be applicable. With respect to transit service, the DTPP <br />Plan-Wide Amendments program SEIR (p. 9-24) explained that “based on guidance published by OPR in 2018, adding <br />transit ridership is no longer considered a significant adverse environmental impact, and therefore the transit-related <br />mitigation measure identified in the DTPP Final EIR (Mitigation Measure 9-9) would not be applicable to the proposed <br />DTPP Plan-Wide Amendments.” <br /> The DTPP program EIR (pp. 9-54 and 9-56) concluded that development occurring under the DTPP would not conflict <br />with a program, plan, ordinance or policy addressing the circulation system, including roadway, bicycle, and <br />pedestrian facilities. The DTPP Plan-Wide Amendments program SEIR (p. 9-24) concurred with the DTPP EIR <br />conclusion. In addition, as explained in the DTPP program EIR (p. 9-35), the project would be required to contribute <br />to the City’s Traffic Impact Mitigation Fee (now the “Transportation Impact Fee”), which is used for various <br />pedestrian, bicycle, and traffic operation improvements that are identified by the City. The SEIR found that the <br />implementation of the Plan-Wide Amendments would promote various transportation goals and not conflict with a <br />program, plan, ordinance or policy addressing the circulation system, including transit, roadway, bicycle and <br />pedestrian facilities and this impact was less than significant. <br /> The Commercial Component would provide sidewalk improvements around the site perimeter as well as additional <br />street frontage improvements to enhance pedestrian comfort and safety (e.g., new curb-ramps and bulb-outs, street <br />trees, street lights) and amenities for bicyclists, as follows: <br /> the existing California Street/James Avenue intersection would be removed because of the abandonment of <br />California Street between Winklebleck Street and James Avenue would be replaced with a new sidewalk and a <br />portion of the creek restoration area; <br /> the existing Winklebleck Street/California Street intersection would be redesigned to accommodate the proposed <br />Franklin Street extension and include redesigned bulb-outs at what would be the Winklebleck Street/California <br />Street/Franklin Street intersection; <br />ATTY/RESO.0028/CC RESO CEQA GUIDLINES (920 SHASTA) - EXHIBIT A <br />REV: 04-22-25 VR <br /> <br />Page 128 of 148
The URL can be used to link to this page
Your browser does not support the video tag.