My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso25 16297
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2020-2029
>
2025
>
Reso25 16297
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 4:04:39 PM
Creation date
4/29/2025 4:04:20 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Meeting Type
Regular
Date
4/28/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTY/RESO.0030/CC RESO WATER SUPPLY ASSESSMENT (901 EL CAMINO REAL) <br />REV: 04-22-25 VR <br />Page 2 of 2 <br />WHEREAS, the Public Works Services Department has prepared a Water Supply <br />Assessment for the Residential and Commercial Project pursuant to the applicable Water <br />Code provisions, including Water Code Section 10910 et seq. <br />NOW, THEREFORE, BE IT RESOLVED THAT THE CITY COUNCIL OF THE <br />CITY OF REDWOOD CITY AS FOLLOWS: <br />Section 1. The recitals set forth above are true and correct and are hereby <br />incorporated herein by this reference as if fully set forth in their entirety. <br />Section 2. The City Council has reviewed the Water Supply Assessment, which is <br />attached hereto as Exhibit A, with its data and analysis set forth therein, the <br />documentation contained in the administrative record in support of the Water Supply <br />Assessment, and other relevant records on file with the City. Based on such information, <br />the City Council, exercising its independent judgment, hereby finds as follows: <br />(a)The City’s existing and prospective water supplies and recycled water <br />supplies and its water conservation measures comprise the City’s water supply for <br />the projected demand of the Commercial Project and Residential Project; <br />(b)A sufficient water supply is available for the Proposed Projects because the <br />total projected water supplies, determined to be available for the Projects during <br />normal, single dry, and multiple dry water years during a 20-year projection, will <br />meet the projected water demand associated with the proposed Projects, in <br />addition to existing and planned future uses, including agricultural and <br />manufacturing uses; <br />(c)All infrastructure necessary to deliver a water supply to the Commercial <br />Project and Residential Project is in place, excepting any distribution facilities <br />required to be constructed and financed by the Applicants; and <br />(d)The Water Supply Assessment confirms the conclusions of the CEQA <br />Consistency Checklist prepared for the combined Commercial and Residential <br />Projects, which indicates that the City’s projected water supply is sufficient at this <br />time to meet the proposed Projects projected water demand, adhere to the Urban <br />Water Management Plan, and have less than significant impacts to the City’s water <br />supply and no new mitigation measures are required. <br />Section 3. Pursuant to the requirements of Water Code Section 10910 et seq., the <br />Council of the City of Redwood City hereby approves the Water Supply Assessment for <br />the 901 El Camino Real Project. <br />Section 4. This Resolution shall go into effect immediately upon adoption. <br />* * *
The URL can be used to link to this page
Your browser does not support the video tag.