My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso25 16298
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2020-2029
>
2025
>
Reso25 16298
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 4:06:01 PM
Creation date
4/29/2025 4:05:01 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
4/28/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />121 <br />facilities have been identified due to the project component. The SEIR anticipated the impacts of development from <br />the DTPP Plan-Wide amendment, including the Commercial Components project, and it is not anticipated that a new <br />commercial use would result in demand on police services beyond what was anticipated in the SEIR and necessitate <br />the construction of a new police facility given the existing police substation in the DTPP area at 2223 Broadway. <br /> Schools: The DTPP program EIR (pp. 8-15 through 8-18) concluded that there would be no significant impacts on <br />schools resulting from the DTPP or projects built under it. The DTPP Plan-Wide Amendments program SEIR (pp. 8- <br />8 through 8-9 and pp. 8-18 through 8-19) concurred with the DTPP EIR conclusion. The SEIR (pp. 8-18 and 8-19) <br />determined that while “[d]evelopment as a result of the proposed DTPP Plan-Wide Amendments would result in an <br />increase in population and thus an increase in school-aged children that could be enrolled in RCSD and SUHSD <br />schools,” projects facilitated by the Plan-Wide Amendments “would be required to comply with California <br />Government Code Section 65996 [regarding collection of school impact fees]…would mitigate the potential effect on <br />public school facilities from the new student population.” The SEIR (p. 8-19) concluded that “the payment of school <br />impact fees that may be required by a State or local agency constitutes full and complete mitigation of school impacts <br />from development.” The Commercial Component consists of new commercial use without any on-site residential uses. <br />If future employees with school-aged children so choose to move to Redwood City, they may so choose to reside in <br />existing residences or new residential projects which are subject to the school impact fees. As such, no new or <br />physically altered school facilities or need for new or physically altered school facilities have been identified due to <br />the Commercial Component. <br /> Parks: The DTPP program EIR (pp. 8-6 through 8-15) concluded that there would be no significant impacts on parks <br />and recreation resulting from the DTPP or projects built under it. The DTPP Plan-Wide Amendments program SEIR <br />(pp. 8-4 through 8-8 and pp. 8-15 through 8-18) concurred with the DTPP EIR conclusion. The SEIR (p. 8-16) <br />determined that while development facilitated by the Plan-Wide Amendments “would result in an increase in use of <br />existing City-owned parks and recreational facilities,” and the “resulting use of existing City parks and recreational <br />facilities would occur over time as individual projects are developed.” The SEIR (p. 8-16) concluded that “individual <br />projects developed would be subject to the City’s Parks Impact Fee and parkland dedication requirements (or Parkland <br />In-Lieu Fee), which would fund improvements to existing facilities as a result of increased demand. The increased <br />demand on existing regional parks would also not substantially increase or accelerate the physical deterioration or <br />degradation of existing parks and recreation facilities, as these areas are much larger in size and have planned for <br />regional recreational use.” The Commercial component would involve the removal of Little River Park and provide a <br />3,934 square-foot open space plaza (“chrysanthemum plaza”). This component would retain, realign, improve and <br />enlarge a portion of Arroyo Ojo, also known as Little River Creek and extend it toward El Camino Real, resulting in <br />a 10,151 square-foot creek open space area (Creek Park Mitigation Area); see item IV, Biological Resources and item <br />XIX, Utilities and Service Systems for more details. The Commercial Project component would also include a 6,450 <br />SF teen center/ multi-purpose space. The new plaza and teen center/multi-purpose space would accommodate park <br />and recreational uses; Arroyo Ojo/the Creek Park Mitigation Area would provide passive open space. As such, no <br />need for new or physically altered off-site park facilities have been identified due to the Commercial Component. <br /> Other Public Facilities: The DTPP program EIR did not address potential impacts on other public facilities resulting <br />from the DTPP or projects built under it. The DTPP Plan-Wide Amendments program SEIR (pp. 8-9 and 8-20) <br />concluded that there would be no significant impacts on other public facilities resulting from the DTPP, as amended, <br />or projects built under it. The DTPP Plan-Wide Amendments program SEIR (p. 8-20) determined that while <br />development as a result of the proposed DTPP Plan-Wide Amendments “would likely result in a modest increase in <br />demand for services from RCPL [Redwood City Public Library Department] libraries,” because the City provides the <br />primary funding for libraries, development “would result in the generation of new property taxes and other revenues <br />that go into the City’s General Fund, and thus could provide more resources to cover the increased budget for library <br />services.” The SEIR determined that the increased demand, in and of itself, would not be anticipated to require new <br />or expanded facilities. The SEIR anticipated the impacts of development from the DTPP Plan-Wide amendment, <br />including a version of the Commercial Project, and a new commercial office use would generate new revenues that <br />may go towards funding library services; in addition, it is not anticipated that a new commercial office use would <br />result in demand on library services beyond what was anticipated in the SEIR and would not necessitate the <br />construction of a new library facility given the existing Downtown Library in the DTPP area at 1044 Middlefield <br />Road. As such, no new or physically altered public facilities or need for new or physically altered public facilities <br />have been identified due to the Commercial Component. <br /> Public Services Conclusion: Under the proposed Commercial Component, no additional impacts on public services <br />are anticipated, and no additional mitigation is required. Therefore, this component would have a less than significant <br />ATTY/RESO.0031/CC RESO CEQA GUIDELINES (901 EL CAMINO REAL) <br />REV: 04-22-25 VR <br /> <br />Page 121 of 148
The URL can be used to link to this page
Your browser does not support the video tag.