<br /> <br /> <br />123 <br />from Scott Adams, P.E., West Coast Code Consultants, Inc. [WC3] to William Chui, City of Redwood City, May 18, <br />2023). According to the Utility Report (Appendix H), 2019 California Fire Code requirements for this type of structure <br />indicate a flow rate of 5,250 gallons per minute (gpm) with a flow duration of four hours (“Utility Report, Residential <br />Building, 920 Shasta Street, Redwood City, CA 94063,” Luk & Associates, June 16, 2023, “Appendix-H: Fire Water <br />Demand Determination”). As noted in the Utility Report (p. 6), “Any deficiency between available water pressure <br />and required water pressure shall be resolved by utilizing a fire pump (or equivalent) to increase the building’s water <br />pressure.” <br /> In addition, as a standard condition of approval, the Housing Component must demonstrate, in conformance with the <br />City’s Engineering Standards, that the existing water main meets the domestic and fire flow requirements in <br />accordance with City Code Section 38.26 and the International Fire Code. If the existing water main is not sufficient <br />as determined by the City Engineer, the applicant shall, as part of the Housing Component, construct and install new <br />water mains sufficient to meet these requirements, in accordance with the City’s Engineering Standards and as directed <br />by the City Engineer. <br /> Housing Component plans indicate access for Fire Department aerial fire apparatus would be provided along the <br />Shasta Street side of the building and would meet the minimum 26-foot-wide California Fire Code standard for <br />buildings taller than 30 feet. Other access to the building would be via Buckeye Street (20-feet wide) and an 83-foot- <br />long, 20-foot-wide fire lane at the northeast corner of the Housing Component site off of Shasta Street. (Plan Sheet <br />G003, 10/6/23) <br /> In addition, the Housing Component applicant has submitted an Alternate Materials and Methods Request (AMMR) <br />to the City addressing a project component Fire Code inconsistency of the open-sided pedestrian walkway related to <br />emergency escape and rescue openings on the podium level. As shown on the Housing Component plans, a portion <br />of the egress court passes beneath the pedestrian walkway. The Housing Component proposes several enhanced fire <br />protection features to the pedestrian walkway for Fire Department review and approval. (Plan Sheet G003, 10/6/23). <br />Completion of the alternate means and methods (AMMR) process and implementation of these enhanced fire <br />protection features, as refined or revised by the Fire Marshal, would be a condition of approval. <br /> Police Protection: The Focused GPU program EIR (pp. 4.15-10 and 4.15-11) found that while “increased land use <br />intensity in the Planning Area could increase the frequency of emergency and non-emergency calls to the Redwood <br />City Police Department, as compared with existing conditions” the future development would not be “anticipated to <br />increase demand for police protection to the extent that new facilities would be required.” The Focused GPU EIR (p. <br />4.15-11) determined that “the construction or expansion of existing police facilities would not be anticipated as a result <br />of the Project [the Focused GPU]. The Housing Component would not result in substantial adverse physical impacts <br />associated with the provision of new or physically altered police facilities.” The Focused GPU EIR determined that <br />while new development would incrementally increase demand on police protection services, such demand would be <br />offset by increased property tax revenues which can then be used for the maintenance and/or expansion of police <br />protection facilities and did not anticipate needing to expand existing or build new police facilities as a result of <br />potential population and land use intensity increases from the Focused General Plan Update. The GPU EIR anticipated <br />the growth from the Focused General Plan Update, and it is not anticipated that a new residential project comprising <br />100 units would result in demand on police services beyond what was anticipated in the GPU EIR and necessitate the <br />construction of a new police facility. No new or physically altered police facilities or need for new or physically altered <br />police facilities have been identified due to the Housing Component. <br /> Schools: The Focused GPU program EIR (pp. 4.15-11 and 4.15-12) determined that future development facilitated by <br />the Focused GPU “would result in increased residential building area and a higher population in the Planning Area,” <br />and concluded that because “new development in the Planning Area would be required to pay Development Impact <br />Fees and any school facility updates or expansions would be required to undergo environmental review as part of the <br />development review process, impacts related to the need for new school facilities as a result of the proposed Project <br />would be less than significant.” The Housing Component consists of a new residential building and would be required <br />to pay Development Impact Fees as applicable. As such, no new or physically altered school facilities or need for new <br />or physically altered school facilities have been identified due to the Housing Component. <br /> Parks: The Focused GPU program EIR (pp. 4.16-16) determined that while the Focused GPU does not propose the <br />construction or expansion of recreational facilities, “Should open space/recreation improvements associated with <br />development under the [Focused GPU] Project be proposed, these improvements would mostly likely take place on <br />already developed or previously developed property and/or would create little or no additional impacts within other <br />issue areas (e.g., noise, air quality, traffic).” The Focused GPU EIR (p. 4.16-15) concluded that “future development <br />of public parks in the Planning Area plus individual project payment of City adopted park in-lieu fees and/or dedication <br />ATTY/RESO.0031/CC RESO CEQA GUIDELINES (901 EL CAMINO REAL) <br />REV: 04-22-25 VR <br /> <br />Page 123 of 148