Laserfiche WebLink
<br /> <br /> <br />13 <br />SEIR. The DTPP SEIR also assumed that up to 30 percent (up to 350,100 square feet) of <br />the office cap may be devoted to Research and Development Laboratory use. As one of the <br />original six proposed Gatekeeper projects, the 901 El Camino Real project was included in <br />the SEIR’s programmatic level evaluation with the understanding that project-specific <br />entitlements would be considered by the City when an individual project was brought <br />forward for action regarding project entitlement(s), and project-level CEQA review would <br />be necessary to determine whether the environmental effects of a future development <br />proposal is within the scope of the SEIR or if further review would be required. <br />The current 901 El Camino Real project being evaluated in this analysis differs from the <br />original concept analyzed in the SEIR as follows: <br /> <br /> The 901 El Camino Real project would remain a six-story building. <br /> The office space is now approximately 305,225 square feet rather than the SEIR <br />259,000. <br /> The office space may be occupied for R&D use. The DTPP SEIR assumed up to <br />350,100 square feet of R&D use in the DTPP, which is 30 percent of the office cap. <br /> The total teen center/multi-purpose space square footage proposed is approximately <br />6,450 rather than the SEIR teen center space of 8,000. <br /> The 901 El Camino Real project does not include retail square footage compared to the <br />SEIR which assumed 3,000 square feet of retail. <br /> The square footage for the open space is approximately 14,091, which includes the <br />3,934 square-foot Chrysanthemum Plaza and the 10,151 square feet of creek open <br />space, rather than the 23,200 square feet of open space identified in the SEIR. <br /> Onsite parking for the current 901 El Camino Real Commercial Component would <br />total approximately 513 vehicle parking spaces (309 self-parking spaces and 204 <br />spaces for valet assisted parking) rather than the SEIR 340 below-grade motor vehicle <br />parking spaces (up to 590 spaces with valet operations). <br /> Bicycle parking in the current project would total approximately 164 bicycle spaces <br />rather than the original 68 bicycle spaces. <br /> The Commercial component would still include the land exchange as described above <br />in Section 8. Description of Project. <br /> The Commercial component would still include realignment of the street grid by <br />extending Franklin Street north from James Avenue to the intersection of Winklebleck <br />and California Streets, closing California Street west of Winklebleck Street, and <br />closing Winklebleck Street south of California Street. <br /> The Commercial Component would still include the removal of existing Little River <br />Park. <br /> <br />This Consistency Checklist is to determine whether further environmental review beyond <br />that which was provided by the DTPP EIR and SEIR (from here on, collectively referred <br />to as the “EIR/SEIR”) is necessary for the currently proposed Commercial Component. <br />As noted above, California Public Resources Code section 21083.3 and CEQA Guidelines <br />Section 15183 provide a statutory exemption from additional environmental review for <br />projects that are consistent with the development density established by existing zoning, <br />community plan or general plan policies for which an EIR was certified, except as might <br />be necessary to examine whether there are project-specific significant effects which are <br />peculiar to the project or its site. This streamlines environmental review not because a <br />project does not have any potential environmental effects, but because the project’s effects <br />have already been sufficiently accounted for and addressed in a previously certified <br />EIR/SEIR. <br />ATTY/RESO.0031/CC RESO CEQA GUIDELINES (901 EL CAMINO REAL) <br />REV: 04-22-25 VR <br /> <br />Page 13 of 148