My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Reso25 16298
RedwoodCity
>
City Clerk
>
Resolutions
>
City Council
>
2020-2029
>
2025
>
Reso25 16298
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/29/2025 4:06:01 PM
Creation date
4/29/2025 4:05:01 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Resolution
Date
4/28/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />67 <br />Community Development and Transportation Department), in coordination with a qualified paleontologist, assess <br />individual development proposals for the potential to destroy unique paleontological resources and to determine <br />provisions to protect such resources when applicable, possibly including complete avoidance of the resources, in-place <br />preservation, and/or data recovery as detailed in Mitigation Measure 7-1. The DTPP Plan-Wide Amendments program <br />SEIR (pp. 16-13 and 16-14) concurred with the DTPP EIR conclusion and includes Mitigation Measure GEO-6, which <br />restates Mitigation Measure 7-5 from the DTPP Final EIR with minor text revisions (“clarifying amendments”). <br />Therefore, this impact was found to be reduced to a less-than-significant level with mitigation. <br /> The proposed Commercial Component would not cause a potentially significant impact to any known (recorded) <br />paleontological resources in the project component vicinity. Nevertheless, it would be subject to Mitigation Measure <br />GEO-6, which shall be required as a condition of project approval and would reduce the potential impacts of the <br />project component on paleontological resources to a less-than-significant level. Therefore, the Commercial <br />Component is consistent with the analysis in the EIR/SEIR because it would not create new impacts or increase <br />impacts, and there is no new information of substantial importance for CEQA purposes. <br />CONCLUSION <br />With regards to the issue area of Geology and Soils, the following findings can be made: (1) no peculiar impacts to <br />the Commercial Component or its site have been identified, (2) there are no potentially significant off-site and/or <br />cumulative impacts which were not discussed by the EIR/SEIR, (3) no substantial new information has been identified <br />which results in an impact which is more severe than anticipated by the EIR/SEIR, and (4) feasible mitigation measures <br />contained within the EIR/SEIR would be applied to the project component and render its specific impacts less than <br />significant. For these reasons, the geology and soils impacts of the proposed Commercial Component would be <br />consistent with the impacts identified in the EIR/SEIR, and this project component does not require additional <br />environmental review under CEQA Guidelines section 15183. <br /> <br />Housing Component: <br />a. i) The Redwood City Focused GPU EIR Planning Area is located within the seismically active San Francisco Bay <br />Area. The significant earthquakes that occur in the Bay Area are generally associated with crustal movement along <br />well-defined, active fault zones of the San Andreas Fault system, which trends in a northwesterly direction. The <br />project component site is located approximately 3.6 miles northeast of the San Andreas Fault. Other major active <br />faults in the region include the Hayward, Rodgers Creek, Calaveras, San Gregorio-Sal Cove, Maacama, West Napa, <br />Green Valley, Concord, and Greenville Faults. The two nearest major active faults in the area (not including the San <br />Andreas Fault) are the Hayward Fault, located over 14 miles from the project component site, and the San Gregorio- <br />Seal Cove Fault, located approximately 15 miles northwest of the project component site (Focused GPU EIR p. 4.7- <br />1). The Focused GPU EIR found this impact to be less than significant. <br />The Housing Component site is not within an Alquist-Priolo Earthquake Fault Zone (Focused GPU EIR p. 4.7-1); <br />therefore, there is no known potential for fault rupture on the site. The Housing component is consistent with the <br />analysis in the EIR/SEIR because it would not create new impacts or increase already identified impacts, and there is <br />no new information of substantial importance for CEQA purposes. <br />ii) and (iii) The Housing Component site lies in a seismically active region and is subject to ground shaking from an <br />earthquake along major active regional faults. This is common to virtually all development in the San Francisco Bay <br />Area. Development on the site would be subject to review and approval by the City, and shall be designed and <br />constructed in accordance with all applicable seismic standards adopted by the City of Redwood City, including the <br />California Building Code (CBC) (Title 24 Part Two) and/or California Historical Building Code (CHBC), which <br />requires that a site-specific, design-level geotechnical report be conducted and report prepared by a California- <br />registered professional geotechnical engineer (Focused GPU EIR p. 4.7-13). The site-specific geotechnical report <br />must adequately prepare for foreseeable geologic and soils disturbances that may impact a proposed project <br />component. The geotechnical report is required in the City’s GPU through Policies PS-6.1 and PS-6.3, and Program <br />PS-24 (Geotechnical Analysis), and the City Code (Section 9.154 – Geotechnical Report). The City Code contains <br />development standards that further mitigate potential impacts related to soil and geological phenomenon, namely <br />earthquake related events, seismic ground shaking, liquefaction, and landslides that have the potential to create risk <br />of loss, injury or death (Focused GPU EIR, p. 4.7-13). <br />Techniques and standards for effective geotechnical practices are widely known and accepted. Individual measures <br />for particular sites and projects are typically specified at a detailed level of design. The City routinely requires such <br />geotechnical/geologic investigations and specifications, and a significant record exists demonstrating the effectiveness <br />of such design and engineering requirements in adequately addressing potential soil and geologic issues. Under the <br />ATTY/RESO.0031/CC RESO CEQA GUIDELINES (901 EL CAMINO REAL) <br />REV: 04-22-25 VR <br /> <br />Page 67 of 148
The URL can be used to link to this page
Your browser does not support the video tag.