Laserfiche WebLink
<br />Page 31 of 37 <br />20016287.14 <br />Exhibit C: Eligible Costs for Reimbursement <br /> <br />Program / Promotions – activities pertaining to marketing/promotional programs detailed in the <br />Scope of Work. <br /> <br />Planning – activities necessary to implement planning studies covered under the Scope of <br />Work. <br /> <br />Project Initiation Documents (PID) – activities necessary to complete PIDs covered under the <br />Scope of Work. <br /> <br />Environmental Studies – environmental studies costs, including determination of the <br />appropriate environmental document, preparation of all preliminary engineering for each <br />alternative, including geomantic layouts, determination of right-of-way needs, environmental <br />technical studies (such as air, noise, energy, cultural resources and hazardous waste), and all <br />other studies or activities necessary to prepare and finalize the appropriate documents for <br />Project and environmental approval. <br /> <br />Design – design activities such as preparation of design studies; materials and foundation <br />reports; drainage, hydrology and hydraulic reports; surveying and mapping; preparation of the <br />plans, specifications and estimate; preparation of bid documents and Project files; preparation <br />of permit applications and maintenance agreements; coordination of agency reviews and any <br />other activities necessary to prepare final plans specifications and estimate (PS&E) for bid <br />advertisement and award; and management oversight of these tasks except as limited in the <br />Agreement. <br /> <br />Right-of-Way Acquisition – all activities related to right-of-way including determination of right- <br />of-way needs; title searches; preparation of appraisal maps, legal descriptions and plat maps; <br />parcel appraisals and appraisal reviews; hazardous materials testing and analysis; preparation <br />of right-of-way acquisition documents; activities involved with acquiring rights-of-way including <br />negotiation with property owners and cost associated with condemnation proceedings (including <br />legal costs, expert witness costs, etc., but not including costs related to claims for inverse <br />condemnation), right-of-way capital costs and cost-to-cure impacts related to the acquisition. To <br />the extent allowed by law, Sponsor will undertake all best efforts so that cleanup of existing <br />hazardous materials will remain the liability of the property owner. <br /> <br />Services provided for right-of-way activities involved with property not necessary for the <br />Measure A or Measure W Highway Program-funded Project as defined in the Scope of Work, <br />and the associated costs for all such property, will be at the sole expense of the Sponsor. <br /> <br />Any property not used for construction of the Project, or used for any purpose other than <br />construction of the Project as defined in the Scope of Work, should be identified and the funding <br />agencies should be informed. Any excess right-of-way will be identified as early as possible in <br />the Project design process and sold. The proceeds from the sale of such property must be <br />returned to the funding agencies, prorated based on the percentage of funds each agency <br />contributed to the purchase of the property. <br /> <br />Construction – construction expenditures for the Project (construction capital, management <br />and inspection, surveys, public outreach, and related activities) that are part of the Scope of <br />Work agreed to by the TA. Sponsor must submit all change orders over $50,000 to the TA for <br />ATTY/AGR/2025.031 - 2025 TA PRIMARY GRANT AGREEMENT <br />REV: 02-27-25 LR