My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
AgdaPkt 2025.05.12 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2025
>
AgdaPkt 2025.05.12 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2025 12:53:20 PM
Creation date
5/23/2025 12:48:26 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Date
5/12/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
633
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
125588483 <br />STATEMENT OF APPLICANT'S CONTRACT <br />ANTICIPATED COSTS.* <br />RWC PUMP STATIONProject Name: <br />761 BRADFORD ST, REDWOOD CITYProject Location: <br />125588483Notification Number: <br />PM Number(s): (Gas)35442402(Electric) <br />APPLICANT COSTS <br /> <br />The following statement must only include the contracted anticipated installed costs of <br />facilities installed by the Applicant that are refundable and that are PG&E's responsibility <br />under its tariffs. <br /> <br />The costs provided by the Applicant must be taken from the Applicant's contract with its <br />contractor. If the Applicant will be performing the work itself, the Applicant must also <br />complete and sign this form. <br /> <br />The Applicant's statement of costs will be compared with PG&E's estimated installed costs of <br />the same facilities, the lower of which will be used to determine the amount subject to <br />allowances and refunds in accordance with the provisions of PG&E's Gas and Electric Rules 15 <br />and 16. <br /> <br />If the Applicant chooses not to provide its costs, it must complete the last section of this <br />form. Until the Applicant either provides the refundable cost from its contract with its <br />contractor (or its own cost, if applicable), or returns this form indicating that it will not <br />do so, PG&E will not proceed with any work on the Applicant's project. <br /> <br /> · Applicant's statement of costs include: overhead or underground service conductors,poles, service <br />transformers, connection fittings, service pipe, valves, service connections,and other PG&E-owned <br />service equipment, as detailed in Gas and Electric Rule 16. <br /> <br /> · Applicant's statement of costs DOES NOT include: inspection fees, nonresidential service costs, <br />regulators, or PG&E-owned metering equipment. <br /> <br />Form 79-1003 <br />Advice 4350-G/6050-E <br />February 2021 <br />†Information collected on this form is used in accordance with PG&E's <br />privacy policy. The privacy policy is available at pge.com/privacy <br />Automated document, Preliminary Statement, Part A <br />Page 1 of 2 <br />GAS ELECTRIC <br />Residential Service Facilities:Residential Service Facilities: <br />#applicantCostGas#Applicant: $#applicantCostElec#Applicant: $ <br /> $0.00 PG&E: $0.00 PG&E: <br />0Number of gas service:0Stubs:0Number of Electric service: <br />#Form 79-1003# <br />November 18, 2024 <br />* This form at all times shall be subject to such modifications as the California Public Utilities Commission May direct form <br />time to time in the exercise of its jurisdiction. <br />6.A. - Page 8 of 13 <br />12
The URL can be used to link to this page
Your browser does not support the video tag.