Laserfiche WebLink
Cost Breakdown <br />1Total number of combined meters: <br />1Total number of non-residential lots/units for this project: <br />0Total number of residential lots/units for this project: <br />Cost of Services: <br /> $0.00 Engineering & Administrative Costs <br />Inspection Fees $0.00 (+) <br />Others (N/A) $0.00 (+) <br />Electric Metering $0.00 (+) <br />Service Tie-In Cost (Energized) by PG&E $0.00 (+) <br /> Including Applicant Design Value of $0.00 <br /> $0.00 (+)Service Cost - Applicant installed 0# Services <br /> $0.00 (+)0# ServicesService Cost - PG&E installed <br /> $0.00 (=)Total Estimated Cost of Service Subject to Allowance <br />Cost of Service Within Allowance: <br />less Total Residential Service Allowance <br /> (not to exceed Total Estimated Cost of Service Subject to Allowance) <br />Excess Service Cost <br />Estimated Service Cost Within Allowance (Total less Excess) <br />Average Cost per Lot or Unit Within Allowance <br />Excess Service Allowance Applied to Distribution Line Extension Refundable <br />Amount per Lot or Unit: <br />Applicant:Vicky Lau <br />Project Location/Name 761 BRADFORD ST, REDWOOD CITY <br /> $0.00 0X $0.00 (-)= <br /> $0.00 =0/ $0.00 <br /> $0.00 (=) <br /> $0.00 (=) <br /> $0.00 <br />Allowance <br />- $0.00 <br />Ave. Cost / Unit <br /> $0.00 = <br />Service Tie-in Cost by Applicant $0.00 (+) <br />** <br /> Including Net Joint Pole Credit Value of $0.00 <br />Page 1 of 4000125588483 <br />November 18, 2024 <br />Pacific Gas and Electric Company <br />Detailed Cost Sheet - Electric Distribution <br />and Service Extension Costs <br /> References <br />Notification #125588483 <br />Contract #50096078 V2 <br />E15-PM #35442402 <br />E16-PM #35442402 <br />ERR-PM #35442402 <br />Customer #3933480 <br />6.A. - Page 10 of 13 <br />14