Laserfiche WebLink
Page 4 of 20 <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel: 650-780-7000 www.redwoodcity.org <br />Bay Area Water Supply and Conservation Agency to advocate for a balanced implementation of the Bay- <br />Delta Plan, and exploration of alternative water supplies. By identifying potential constraints and <br />strategies, the UWMP provides a comprehensive approach to ensuring long-term water supply reliability <br />for the region. <br />b. Water System Master Plan <br />The Water System Master Plan (WSMP) was adopted in 2011 and prioritizes capital improvements to the <br />system over a 20-year planning horizon, with an update expected in the next five years. It outlines <br />strategies for maintaining and improving the water system’s service levels to meet three Level of Service <br />(LOS) goals: <br />1) Ensuring reliable customer service; <br />2) Protecting public health and operator safety; and <br />3) Identifying cost-effective projects. <br />These LOS goals guide capital expenditures and help determine the water rates and connection fees <br />needed to support the water system. Given that Redwood City developed over 150 years, regular <br />investments are needed to maintain reliable water service, particularly for approximately 40 percent of <br />the City’s water infrastructure that was originally installed between 1903 and 1950. The WSMP also <br />includes a Seismic Vulnerability Assessment and plans for systematically retrofitting water system facilities <br />for resiliency in the event of an earthquake. A 2023 update to the Seismic Vulnerability Assessment helps <br />ensure that the seismic assessment findings remain current. <br />The WSMP highlights the need for an additional 6 million gallons of potable water storage near the <br />downtown area for emergency preparedness in the event that the City temporarily loses water supply <br />from the SFPUC. While the City currently has sufficient storage for the downtown area, this supply relies <br />on long distribution pipelines, which could be compromised if the pipe network is damaged during a <br />disaster, potentially limiting water availability. One challenge is identifying a suitable location for this new <br />water storage facility. To support this initiative, the City has been allocating funding for a downtown <br />storage facility and collecting capacity fees from new development projects to ensure that they fund their <br />proportionate share of the costs of existing and future water system facilities and assets that are <br />reasonably necessary to provide water capacity for new development. <br />The City has made significant progress with implementing the WSMP since 2012. Achievements include: <br />Replaced roughly 10 miles of aging and undersized water distribution pipelines <br />Rehabilitated two pump stations <br />Anchored electrical equipment at pump stations <br />Seismically retrofitted eight storage facilities <br />Reinforced water pipes on Redwood Shores bridges <br />Completed seismic improvements on the Redwood Shores Transmission Main <br />Added 750,000 gallons of storage for improved fire protection <br />The City continues to make progress on the objectives identified in the WSMP, including additional seismic <br />upgrades. Construction is underway at Easter Bowl and Glenloch Water Tanks to install seismic <br />improvements such as foundation anchors and flexible pipe connections. Replacement of water <br />9.A. - Page 4 of 20 <br />489