My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agda Pkt 2025.06.09 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2025
>
Agda Pkt 2025.06.09 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2025 4:34:20 PM
Creation date
6/10/2025 4:28:06 PM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Regular
Agency Type
City Council
Date
6/9/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CONSENT CALENDAR - Continued <br /> 6.F. Award of contract to SubTerra Construction for the <br /> Veterans Boulevard Sanitary Sewer Replacement <br /> Project - Phase 3 <br /> <br />Recommendation: <br />By motion, approve and authorize the City Manager to: <br />1. Execute the contract documents for the Veterans Boulevard Sanitary <br />Sewer Replacement Project – Phase 3; <br />2. Reject the non-responsible apparent low bid of $4,261,570 from <br />JMB Construction, Inc.; <br />3. Award the standard form construction contract to the second lowest <br />responsible bidder, SubTerra Construction, Inc., for their responsive <br />and responsible bid of $4,375,600; and <br />4. Increase the contract amount, if necessary, up to 10 percent of the <br />amount awarded, for a total amount not to exceed $4,813,160.
The URL can be used to link to this page
Your browser does not support the video tag.