Laserfiche WebLink
4. Can you please confirm if the pad should be Brock Powerbase YSR or SP23? Brock YSR is called <br />out in the turf spec whereas SP23 is called out in the base spec. This question is for Mitchell Field <br />at Red Morton Park. Pad to be SP23. See Specification Section 32 18 14 "Synthetic Turf Base" Red <br />Morton — Mitchell Synthetic Turf Field Project. <br />S. I realized that the existing pad in the outfield is SP -23. Can you confirm if we are salvaging this <br />pad for reuse and adding new SP -23 to the infield, or replacing the pad entirely for Brock YSR? <br />The scope of work is to salvage / reuse the SP23 pad and install new SP23 pads for the new turf <br />infield at Red Morton -Mitchell Field. See Specification Section 32 1814 "Synthetic Turf Base" Red <br />Morton — Mitchell Synthetic Turf Field Project. <br />6. Please confirm if maintenance equipment is required, a groomer and sweeper? Groomer and <br />sweeper are not required, but training at the start of use of both fields is required. See <br />Specification Section 3218 13 "Synthetic Turf Playing Field", both fields. <br />7. Please confirm the pad at Fair Oaks Soccer Field. Brock YSRHD pad to be used for Fair Oaks. See <br />Specification Section 32 18 14 "Synthetic Turf Base" Fair Oaks Synthetic Turf Replacement Project. <br />8. Would the City consider a time extension to the due date by chance? No time extensions will be <br />provided to follow the project timeline that the city has set. Refer to specification sections 00 <br />1113 "Notice inviting Bids" and section 00 2113 for bid submittal timeline. <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel. 650-780-7380 www.redwoodcity.orlc <br />3 <br />