My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt25 FieldTurf USA, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2025
>
Agmt25 FieldTurf USA, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2025 11:53:48 AM
Creation date
6/16/2025 11:53:30 AM
Metadata
Fields
Template:
Agreement
PROJECT NAME
Mitchell Fair Oaks Field Synthetic Turf Replacement Project
RMP File Number
304
Date
6/13/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. Can you please confirm if the pad should be Brock Powerbase YSR or SP23? Brock YSR is called <br />out in the turf spec whereas SP23 is called out in the base spec. This question is for Mitchell Field <br />at Red Morton Park. Pad to be SP23. See Specification Section 32 18 14 "Synthetic Turf Base" Red <br />Morton — Mitchell Synthetic Turf Field Project. <br />S. I realized that the existing pad in the outfield is SP -23. Can you confirm if we are salvaging this <br />pad for reuse and adding new SP -23 to the infield, or replacing the pad entirely for Brock YSR? <br />The scope of work is to salvage / reuse the SP23 pad and install new SP23 pads for the new turf <br />infield at Red Morton -Mitchell Field. See Specification Section 32 1814 "Synthetic Turf Base" Red <br />Morton — Mitchell Synthetic Turf Field Project. <br />6. Please confirm if maintenance equipment is required, a groomer and sweeper? Groomer and <br />sweeper are not required, but training at the start of use of both fields is required. See <br />Specification Section 3218 13 "Synthetic Turf Playing Field", both fields. <br />7. Please confirm the pad at Fair Oaks Soccer Field. Brock YSRHD pad to be used for Fair Oaks. See <br />Specification Section 32 18 14 "Synthetic Turf Base" Fair Oaks Synthetic Turf Replacement Project. <br />8. Would the City consider a time extension to the due date by chance? No time extensions will be <br />provided to follow the project timeline that the city has set. Refer to specification sections 00 <br />1113 "Notice inviting Bids" and section 00 2113 for bid submittal timeline. <br />City of Redwood City 1017 Middlefield Road, Redwood City, CA. 94063 Tel. 650-780-7380 www.redwoodcity.orlc <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.