My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agda Pkt 2025.06.23 Joint SA PFA
RedwoodCity
>
City Clerk
>
Agenda Packets
>
2020-2029
>
2025
>
Agda Pkt 2025.06.23 Joint SA PFA
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/24/2025 11:07:49 AM
Creation date
6/24/2025 11:04:27 AM
Metadata
Fields
Template:
CC Index
CC Index - Document Type
Agenda Packet
Meeting Type
Joint
Agency Type
City Council
Date
6/23/2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
562
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
J.Assist the City in filing project completion reports as well as providing <br />memorandums that summarize activities performed during the construction of <br />projects. <br />K.Assist with NEPA/CEQA documentation and assist the City in identifying <br />distribution and publishing requirements necessary for compliance with <br />NEPA/CEQA and, when requested, undertake the distribution of documents and <br />publishing of required notices with the State Clearinghouse or other entities. <br />L.Assist the City in identifying the level of environmental documents necessary for <br />project approval from State and Federal agencies. This includes but is not limited <br />to projects funded by State and Federal grants. <br />M.Prepare of Initial Studies, Negative Declarations, Mitigated Negative Declarations, <br />Mitigation Monitoring Plans, Early Consultations, Notices of Intent, and Notices of <br />Determination. <br />N.Prepare technical memorandums providing assessments of changes in <br />environmental regulations and advising the City on updates to environmental <br />guidelines and/or environmental review processes. <br />0. Coordinate with environmental permitting agencies to identify and resolve potential <br />environmental issues as early in the decision-making process as feasible. <br />P.Attend public meetings/hearings, as necessary, to provide technical presentations <br />and respond to public inquiries. <br />Q.Review of civil engineering plans for new or rehabilitated sewer facilities (pipelines, <br />manholes, and structures), and provide environmental engineering <br />recommendations. <br />R.Assist the City with Caltrans Preliminary Environmental Study (PES) process and <br />ability to assist City with applicable studies and permits that are required by project <br />specific PES. <br />Schedule of rates <br />Consultant shall be paid on a time and material basis at the hourly rates set forth in the <br />fee schedule below on a not to exceed amount as mutually agreed for each individual <br />task order. <br />Staff classification and rates may change over the contract term if requested by the <br />Consultant and approved by the City Engineer in writing. <br />REV: 05-29-25 LR <br />ATTY/AGR.2025.129/David J. Powers and Associates Inc. (Page 13 of 17) <br />6.A. - Page 18 of 55 <br />26
The URL can be used to link to this page
Your browser does not support the video tag.