My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
Agmt25 FBD Vanguard Construction, Inc.
RedwoodCity
>
City Clerk
>
Agreements
>
2020-2029
>
2025
>
Agmt25 FBD Vanguard Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2025 1:58:14 PM
Creation date
6/27/2025 1:57:45 PM
Metadata
Fields
Template:
Agreement
PROJECT NAME
2024 Curb Ramp Project
RMP File Number
304
Date
6/23/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
19 <br />Thermoplastic Traffic Stripe <br />400 <br />LF <br />$ <br />$ <br />(Detail 22) <br />12 <br />u' O Q fJ <br />_r <br />20 <br />Red Curb Painting <br />2,240 <br />LF <br />$ / <br />$ <br />Blue Curb) <br />(.E� <br />21 <br />_(and <br />New Planter Area <br />810 <br />SF <br />$ <br />$ top <br />22 <br />Cobblestones <br />50 <br />SF <br />$ qo <br />$ <br />23 <br />Ductile Iron Trench Grate (2'x16') <br />1 <br />EA <br />$ 09 OUf <br />$ [(-) OUO <br />24 <br />Detectable Warning Surface <br />Installation at Main Street <br />1 <br />LS <br />$ Q QC)o <br />$ qq 000 <br />25 <br />Bollard Installation at Main Street <br />1 <br />LS <br />+ $ 12, C)00 <br />$ 12 , 001p J <br />Total Bid <br />Price <br />$ q571 & <br />Total Bid Price: <br />huy)dre -cif onv Onu5oN 2 eiq h-} Kundvra an <br />(Indicate Bid Price in Words) J X 60(ja WS <br />In case of discrepancy between the Unit Price and the Total Item Cost set forth for a unit basis <br />item, the unit price shall prevail and shall be utilized as the basis for determining the lowest <br />responsive, responsible Bidder. However, if the amount set forth as a unit price is ambiguous, <br />unintelligible or uncertain for any cause, or is omitted, or is the same amount as the entry in the <br />"Total Item Cost" column, then the amount set forth in the "Total Item Cost" column for the item <br />shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained <br />shall be the Unit Price. <br />For purposes of evaluating Bids, the City will correct any apparent errors in the extension of unit <br />prices and any apparent errors in the addition of lump sum and extended prices. <br />5. The undersigned acknowledges that the Apparent Low Bidder will be determined as <br />provided in Documents 00 1113 (Notice to Bidders) and Document 00 2113 (Instruction <br />to Bidders). <br />6. Subcontractors for work are listed on Document 00 4314 (Subcontractors List), submitted <br />herewith. <br />7. The undersigned Bidder understands that City reserves the right to reject this Bid. <br />8. If written notice of the acceptance of this Bid, hereinafter referred to as Notice of Award, <br />is mailed or delivered to the undersigned Bidder within the time described in Paragraph 2 <br />of this Document 00 4113 or at any other time thereafter before it is withdrawn, the <br />BID FORM 004113-3 <br />2024 Curb Ramp Project <br />
The URL can be used to link to this page
Your browser does not support the video tag.